i just want to know how much require sand and cement for 1 sq.mt including wastage. Please guide me as soon as possible.
1415Lube oil pressure transmitter local it's showing 9.8 kg/cm2 but dcs side it's showing 9.26 like that what is the reason?
Edac,
3 4672What will happen if the Air Preheater is placed before the Economiser?
Bhel, KSPL, Tata Power,
6 877415 kva dg set single phase takes 63amp( approximate) while same rating 15kva three phase takes 35amp approximate. why ? and what will be per phase current for 15 kva
TVI,
2 2953
please tell me what is a light up procedure of Cfbc boiler and what it's axuillaries of cfbc boiler?
wat is the first thing dat is needed, 2 lay a cable in some area??
What is touch potential and step potential?
Explain what are semiconductor devices?
What are solid color dyeing cotton, linen, rayon, and silk?
Explain what is miniaturized satellite?
Difference between HRG and NGR. Are they both the same thing
what is characteristic of a good written constitution?
Define ease?
what is your weaknesses
How capacitor bank can prove superior to synchronous condensers with respect to power factor correction?
kVA rating of ordinary transformer is increased when connected as an auto transformer because A transformation ratio increased B secondary voltage increased C energy is transferred both inductively and conductively D secondary current increased
Transformer diagram mention each parts ?
How to synchoronize the generator (with gcb,GT) to grid????? ????? from Grid iam getting power (rated 400kv/20kv) through GT and its goes to UAT.,,ST.,, now my generator(rated 20kv ) ready.,, now iam closing my GCB.,, in GT iam suddenly giving 20kv on that Gt.,, what will happend
5. Can you work well under deadlines or pressure?