Answer / luckyleafs
its the difference between the stator speed and the rotor speed with respect to stator speed
Ns-stator speed
Nr-rotor speed
slip=(Ns-Nr)/Ns
it usually varies between 0-1
when Ns=Nr then slip=0,that means rotor rotates with the same speed as that of stator,then induction motor is called synchronous motor
| Is This Answer Correct ? | 19 Yes | 1 No |
It is the difference between the synchronous speed ( Ns) and actual speed of the rotor or rotor speed (Nr). It can be expressed in per minute ( Ns - Nr ,both being rpm ),per second or percentage ( Ns - Nr)x 100 /Ns .
| Is This Answer Correct ? | 2 Yes | 0 No |
On monitor it is written that current rating is 2.2 Amps. Is it a monitor current drawing capacity or CPU & monitor. If it is only monitor rating, what will be the rating of only CPU and what will be the power consumption rating of PC, Monitor & Scanner? In net, I learnt that computer consumes only 200-300W while running. With the current rating of 2.2 Amps, how it could be 200-300Watts. Please explain?
On load tap changer (OLTC) explode? Transformer Vector group: Ynd11 Rated Power: 353MVA Rated Current: 693A Voltage:294/20KV OLTC Type: T III Y1000 110/c 12193w Max Operation Current: 295A Step Voltage: 550V Arrangement in Tx windings: Y Connection Problem: Damage of Unit 1 Generator Transformer On Load Tap Changer (OLTC) Description of Incident: 9.00 a.m. :- Generator No Load test on excitation system started 10.30 a.m :- Carried out AVR change over test 11.30 a.m :- Preparation for Generator Manual Synchronizing test 12.00 a.m :- Manual Synshronizing test started. Observed incoming generator voltage higher than running voltage. CECR operator operated Generator Transformer OLTC to bring down the incoming generator voltage 12.03 a.m :-Generator Transformer abnormal alarm operated at Gen.Control Desk (CECR) CECR operater at Generator transformer bay informed that the transformer oil splashed out from OLTC. CECR operater informed that he heard explosion inside OLTC. Observed Oil level & Oil Flow alaram operated at Tranformer local annunciator. 12.05 am :- CECR operator 'Open Gen Field Breaker” 12.10 a.m. :- Elec1 team inspected the OLTC and found the OLTC rupture disk was broken and oil spilled at OLTC area. - Elec1 found the OLTC top cover bulging. Do anyone know why and possibility cause happen in this OLTC.
how regenerative breaking is done in electrical traction
Give a brief idea about Control circuit wiring in Substation...???
what is tan delta point in a current transformer?
hey guys i scored 910 on GRE and 67 on TOEFL respectively.I have an aggregate of about 74%in my B tech.For which colleges should i apply for an MS program in electrical engineering.I am looking for colleges in NJ,SC,NC,GEORGIA, NY. Please reply with a good response.....
If single phase having 220v so why 3phase is440v.
What is the range of efficiency of thermal or steam power plants? Why it is so low?
What aturn on methods of scr?
Whta is earthing?What is the optimum value of Earth Pit?
In a panel 2500A ACB is the incoming breaker then what is the size of the bus bar?
what is hourly consumption of coal in therma plant
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)