Tell me about the synchronization panel.
First Know the Synchronization.
We have to check 4 parameter in sequence listed below.
1. Phase Secquence.(this has to be 1 time.basicly this is
the rotation of the phase.)
2.Voltage has to be equal.(but in practical case votlage
difference not more than 2%)
3.Frequency has to be equal .(but in practical case
Frequency difference not more than 2%)
4.Phase angel difference must be zero(but in practical case
phase angel difference not more than 7*)
so we required in Synchronization Panel.
2 volt meter,2 frequency meter,Phase angel check Relay(CSQ)
in case you dont have the csq you can use the dark lamp
mathod.
Is This Answer Correct ? | 7 Yes | 0 No |
why we use the ac supply load cell>?can we use the dc supply load cell?advantages and disadvantage of the ac supply load cell?
What is the meaning of wet leg
draw shematic diagram of c/v positioner(smart type)?
what is the procedure of O2 sensor(ABB) calibration?
What is basic of instrumentation
What is the meaning of slope in PH transmeter?
What is the difference between HMI and Scada?
difference between vaccum and draft
how to calibrate the interface leveltrol
why cant we use mV instead of mA?
12 Answers ABB, Power Grid, Qatar Gas, USW, Visa Steel,
What is the difference b/w EMF, voltage & potential difference?
Isometric drawings are generated during _________________ phase of a project