Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


If 11 KV breaker on the primary side of a 11 KV/3.3 KV 12.5
MVA transformer can be installed at a distance of 1000 mtrs
through a 11 KV cable. If no what are the probable reasons.



If 11 KV breaker on the primary side of a 11 KV/3.3 KV 12.5 MVA transformer can be installed at a d..

Answer / bala_vlsi

1000 m is not possible because the voltage drop will be
very high so you will consider lot of cable and it is not
practical . if want this system you should consider
overhead line method

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

I have connected 04nos. earthings to a transformer through 04nos. earthing pits seperately. 02nos. earthings are connected to T/F body, and 02nos. earthings are connected to T/F neutral.T/F capacity is 2000KVA, 11KV/415V. But after completing of 02 years successful operation ,we are facing following problems- 1. CT/PT occured blast one time 2. HT cable box occured blast two times 3. One body earthing strip and one neutral earthing strip of transformer are overlapping at some places. Whenever these two strips are pressed at overlapped points, they made spark. What is the reason of spark? Please explain the reason & rectification of above problems

5 Answers  


Why we are mostly using a single 3-phase transformer instead of three 1-phase transformers?

7 Answers  


Can u tell me about HVDC transmission?

6 Answers  


What is icu and ics in Acb and how many time icu or ics passes from breaker?

0 Answers   Engineering Vision,


WHAT ARE THE CHARACTERISTICS OF AN VOLTAG AMPLIFIER

0 Answers  


sir please send me previous year questions of jspl of electrical section through which i could prepare myself fpr the test.

0 Answers  


why we use 50 hz frequency in india .. why not 60 hz 

3 Answers  


Given a collection of points P in the plane, a 1-set is a point in P that can be separated from the rest by a line; i.e. the point lies on one side of the line while the others lie on the other side. The number of 1-sets of P is denoted by n1(P). The maximum value of n1(P) over all configurations P of 19 points in the plane is 18

0 Answers   TCS,


High speed earth switch operation with diagram

0 Answers   KSEB, L&T, Sanden Vikas, Siemens,


Can we use all 3 cores of a cable to connect DC motor + ve terminal and similarly one more cable for - ve terminal.

2 Answers  


what is earthed and inearthed cable or system?

1 Answers   CCCL, L&T,


please anybody help me to find out the BHEL trainee Exam previous year questions papers . if u ve pls. send it to surekhared@gmail.com

0 Answers   Bhel,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)