If 11 KV breaker on the primary side of a 11 KV/3.3 KV 12.5
MVA transformer can be installed at a distance of 1000 mtrs
through a 11 KV cable. If no what are the probable reasons.
Answer Posted / bala_vlsi
1000 m is not possible because the voltage drop will be
very high so you will consider lot of cable and it is not
practical . if want this system you should consider
overhead line method
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
How to decide and select the different earthing wire size for the different types of earthing
- two pumps must work with them at the same time but if the first pump start the second pump must delayed for some time to start also , with motor rated power = 90 KW and rated voltage = 380 V and rated power factor = 0.85 lag please draw the power and control circuit for it and determine all circuit components parameters that you use it
What is an order of a system.
how is calculated the quantity of weight in hot test xlpe?
If symmetrical fault occurs at the terminal of a synchronous motor then how the motor will act...explain it..
The power factor of the fixed load is 0.8, now the p.f is varying from 0.8 to 0.5.
why i can not use thimble on capacitor duty contactor
why constant voltage transformer should be start without load? and if started then what will happen?
if there is nutral in phase why we use earthing wire and grounding? even at fault condition the fault current flows to neutral (it is a lower path)
neutral earth resistance testing is it possible for transformer while in load condition
what is the operating time for LBB and how does the LBB relay realise whether cb is opened or not?
Why do we mostly prefer to generate and distribute electricity in 3 phase and not in 4 phase or 5 phase?
What is T’Q and X’Q and X’D ? and what is saturated as well as unsaturated ?
What is force on parallel conductors ?
What is the difference between rulling span and wind span of of an Over Head Transmission Line?