some ac motor's direction get change dueto ghanging input
to the ac drives.(say ryb to rby). but some motor direction
remains the same when phase sequence is changed fromdive
side. can anybody guide me?



some ac motor's direction get change dueto ghanging input to the ac drives.(say ryb to rby). ..

Answer / k.prakashchandra

If you change connection from RYB to YBR or BRY there will
not be change in direction.

Is This Answer Correct ?    5 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

what reason of line current and phase current in star connection and line current and phase current not equal in delta connection?

0 Answers   Suparco,


How to take vector group test of a transformer? Suppose we dont know the vector group of transformer, how to check its vector group through test? I have 3 transformer DYn11 & DYno& Ynd11, how to confirm its vector group?

1 Answers  


Dear All, Pls let me know about ELR.... CBCT is using for singnal purpose... How it works.. any body can explain pls.......

4 Answers  


where is used dc volage transformer,and what is highest capacity of transformer

2 Answers  


A T-T transformer can not be parallel with transformer A V-V B star-delta C star-star D delta-delta

1 Answers  






Electricty is generated at around 16kV, then step up to 220kV for transmission then steped down to power transformers then DTs and then through the LT n/w it reaches the consumer end. At the consumer end 230V supply is required. So, why is electricity not generated directly at 230V and transmitted?

4 Answers  


what is electricial and mechnical interlock.

9 Answers   Control Dynamics, EFS, HP,


what does happen if generator frequency fall in running condition & what should require immediately

4 Answers  


in 220 kv substation,what is the mean of avr voltage reading? means at oltc temp. 36 the avr voltage was 109v.so what the mean of 109v

1 Answers  


What is the loss of transformer of 220kv/11kv, 63/80 MVA and 18.05% impedance

0 Answers  


what is difference between inductive and reactiveload?

5 Answers   ONGC,


A single line diagram(SLD) and a purchase order of a 11/66kV switchyard of a power plant was given. In the SLD, only one lightning arrestor(LA) was shown, but the purchase order had need of 3 LAs. Is this correct, if yes, why?

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)