Design and explain a circuit to produce an unregulated full
wave D.C supply.



Design and explain a circuit to produce an unregulated full wave D.C supply...

Answer / mahavir jagdev

WHEATSTONE BRIDGE RECTIFIER CIRCUIT IS THE EASIEST.

Is This Answer Correct ?    1 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

In ACS 1000 drive we are using 12 pulse converter,why don't use 3 pulse converter.

0 Answers  


What is the difference between induction generator and synchronous generator?

3 Answers  


Explain Need of a starter in a dc motor.? Also explain any two starting and speed control method of dc motor?

0 Answers  


In dc motor starter there is less voltage required for holding contactor that's may why it is called no volt coil. but in ac starter why holding contactor is called no volt coil.

2 Answers   JSW,


Using 11000V/433V,3 ph,50Hz,500 KVA, what is the maximum capacity of motor in KW that can be connected and started at a single moment? Also explain about any calculations and formulas used in deriving the same.

4 Answers  






In a 3 pin plug holder, what is the purpose of diameter of ground pin is larger than phase and nutral pin

9 Answers   Coal India, HCL,


Why resistance is not measure in running conditions of motor

1 Answers   Falcon,


When i went to a interview the interviewer ask me a question for that i cant able to answer him if anyone knows answer me How will you design a capacitor bank for a plant? if my p.f is 0.6 i have to improve it to 0.9 or 1 what kind of steps i have to do? and is there any formula for calculating this?

2 Answers  


What is Primary and Secondary Injection Test of CT and Relay.

2 Answers  


How to solve the problem of low voltage at consumer end in distribution system if one phase come low voltage of transformer

1 Answers   ABB,




0 Answers   TATA,


I am an electrical contractor in noida, I am registereg in noida vat. i got a contract in Delhi State, my party told me that we shall deduct WCT @4% & reimburse Service tax all in composite scheme. Now Problem is this, 1 Can i able to purchase outside the delhi? 2 Can i produce a c form to our vendors? 3 What is limitation of purchase from outside the Delhi? 4 What % of tax Govt will levied upon me? 5 How can i take credit of tax paid upon purchase made by us. So, like these type questions i have in my mind if any person know the right answer please write to sksproj@gmail.com or contact me on - 8010076534 / 9212758177 / 9718378190. Thanks with Best Regards, S.K.Saxena

3 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16637)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)