during parallel operation of two ac generator which
condition must match before taking both parallel i.e
speed /voltage rating /kva/exciation

Answers were Sorted based on User's Feedback



during parallel operation of two ac generator which condition must match before taking both parall..

Answer / pswin

Parallel operation of alternators is called synchronization. A synchroscope is an instrument for indicating the correct time for switching on. Three conditions must be fulfilled for synchronization.
1. Voltage must be same.
2.frequency must be same. And
3.voltage should be in phase position with respect to local series circuit.
Additional requirement is that the phase rotation must be the same.

Is This Answer Correct ?    27 Yes 3 No

during parallel operation of two ac generator which condition must match before taking both parall..

Answer / kamlesh g patel

incoming machine voltage should match the system/other
generator voltage.
frequency must be the same.
phase sequence must be the same.

Is This Answer Correct ?    12 Yes 4 No

Post New Answer

More Electrical Engineering Interview Questions

Why should we use Star-Delta connection in step down power transformers?

7 Answers   L&T,


How can we calculate strength of copper hich is supplying electric power to heater and in it hold the heater also and what r all types of forces which is acting on it...

0 Answers   ABB,


what is the function of breather in a transformer

29 Answers   Areva, Bhel, RKM Powergen, Vijai Electricals,


define transformer

1 Answers  


WHAT KIND OF LIGHTENING PROTECTION SCHEMS CAN BE ADOPTED FOR THE FLAT ROOF OF BIG DIMENSION.

0 Answers  






I have 90KW Motor 60 Hz,380V Pf 0,88. after testing the Motor without Load is the no load Current 36 A,but wenn i put load after 2 hours the current increase more than 156 A. Can anybode tell me waht is the Problem?

4 Answers   ABB,


The size and construction of bushings in a transformer depend upon?

0 Answers  


what is the difference between AHU and FCU .

1 Answers   JLL,


how to select electrical equipment such as fuse,dg,transformer,motor,msb,wire,cable as per the connecting load..please mention any books to design,take licence

0 Answers   Gujarat Electricity Board,


ANY ONE TELL ME ABOUT generator synchronization panel panel to synchronise 3 gen of 250kva both automatic and manual. 2 gen output vol 415 3ph, 1 gen output vol 400 3ph SEND THE DETAILS DIAGRAM ON THIS EMAIL ADDRESS ayazleo@hotmail.com as soon as possilble best ragrds electrical engineer ayaz mahmood SAUDI TECH

0 Answers  


What is meant by vector group

0 Answers   GPSC Gujarat Public Service Commission, VA Tech Wabag,


what are the materials used in HRC fuse

3 Answers   Bhel,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)