Respected sir i am appearing for the exam this year.I will
be highly obliged if u kindly send me last year's interview
paper on civil engineering in my email address
debosmitroy@yahoo.in
Answer / sjtbehera
look debosmita no question paper are provided by the
company to takehome. is the objective type question &
answering is to given on question paper .
sorry
| Is This Answer Correct ? | 5 Yes | 1 No |
WHAT IS DUCTILITY?
how many grades in concrete? list out
how many stones require for rr masonery work 1cum.
What is the difference between gray swr pipe & red swr pipe
mix proportion of M20 AND what are different grades below it
6 Answers B L Kashyap, L&T, Panchshil Infrastructure,
how to calculate 1:1.5:3 ratio concrete cement, sand, metal and water please give me brief calculation
5 Answers DLF, Sobha Developers,
In jack arch floor, the rise is kept?
How do I calculate the ground is resested for a 5 floor building?
how to calculate the steel for beams and columns for tender purpose? any formula have?
Any bopdy tell me how to prepare rate analysis for Centering and shuttering for RAFT FOUNDATION, SUSPENDED FLOORS, STAIR CASES, RETAINING WALLS, SHEAR WALL and COLUMNS
what"s the formula to calculate the water for M15 grade concrete?
what is a moment connection and shear connection ? where it provided ? why it provided ?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)