how to calculate the steel for beams and columns for tender
purpose? any formula have?
Answers were Sorted based on User's Feedback
Answer / santosh eppili
Generally the thumb rule is
for 100 Cum of concreting 10MT of steel is required.
More over this varies with the type of construction like for light structures it varies from 8-10MT
Med Str 9-12MT
High strength Structures(Industrial) 10-14MT of steel is reqd.
Is This Answer Correct ? | 16 Yes | 2 No |
Answer / afsar ansari
In Beams:2.5 % Volume of R.R.C.(Quantity)
In slabs:1 % Volume of R.R.C.(Quantity)
Is This Answer Correct ? | 9 Yes | 4 No |
Answer / naveen
If the drawings are available, then bar bending schedule is
prepared and the steel quantity is calculated. Depending on
different diameters of bar used the steel quantity can be
calculated. If the loads are given then depending on the
loads the steel value is calculated.
Is This Answer Correct ? | 14 Yes | 10 No |
Answer / kumar
Only previous project cosumtion recrod we can do it
Is This Answer Correct ? | 3 Yes | 11 No |
How and where are aqueducts built?
how the take measurement at column and beam junction
How to Concrete cube test method and required result in 3days & 7days & 28 days, for all grade of concrete which refer the is code no.
What are the phases inspections are done by local authority while construction?
can anybody suggest me or rather send me tutorial of staad pro..iam in real need..thanks..id is:-ankit99991@gmail.com.
can i get civil engineering test papers.......?????
What should be the PH value of water for irrigation purpose
What is limit state method and working stress method and ultimate method
among fine,coarse sand which is used for plaster, brickwork and RCC & why?
Drar the reinforcement detailing of Internal Hinge ?
what is mail role & relationship between senior Civil engineer to consultants , Construction manager ,project manager, project engineer ,Technical engineer & qa/qc engineer ? what is the responsibilites of Senior Civil Engineer?
different types of rcc slab