what is the right method of laying cable tray if we are
using EOT crane in shed, better is below or up
Answer / sufiyan
Definitely if you are using EOT crane then the cable tray must be installed above the height of cross travel of that crane + 0.5 mtr for safety
| Is This Answer Correct ? | 0 Yes | 0 No |
Define active and passive network?
what r the checklist while installing a 380 kva DG set
What is the use of doing meggering for a cable
- two pumps must work with them at the same time but if the first pump start the second pump must delayed for some time to start also , with motor rated power = 90 KW and rated voltage = 380 V and rated power factor = 0.85 lag please draw the power and control circuit for it and determine all circuit components parameters that you use it
when current lags behind voltage how does it affect the circuit.In other words what is the significance of lagging current?
open circuit test when performed on double the voltage & double the freq, then what will happen with p.f and current magnitude?
what will be the motor terminal box connection arrangement (star or delta). on what basis it decided?
Define current?
How do i carry out or know the vector group of a Dyn1 and Dyn5 transformer
11kv = LT 440v , how many amp.supose 440v side 5000 amp curent drown
what is the difference between a feeder and a cable?
can we use breather in a SEALED power or distribution transfomer instead of injecting nitrogen.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)