what is the right method of laying cable tray if we are
using EOT crane in shed, better is below or up
Answer Posted / sufiyan
Definitely if you are using EOT crane then the cable tray must be installed above the height of cross travel of that crane + 0.5 mtr for safety
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is q factor?
If any HVDC line is going with positive & negative(the negative usually have return path of current with earthing electrode). Now the question is if this HVDC earthed electrode which is using as return path and earthed any nearby 400kv or 220kv AC substation equipments. which will be the impact of this on AC substation & its equipment, how severe may be this and what should be the minimum distance require between HVDC earthed electrode and AC substation equipments? It's really an high engineering level question...Dare to answer and increase your knowledge.
What are the advantages of hydropower?
i am in need of AC SYNCHRONUS MOTOR 30KW. ANY ONE KNOWS THE MANUFACTURER OF SAME. ALSO MOSFET AC CONVERTER 20KVA CONT.OUTPUT.
difference between semiconductor & conductor & insulator?
how to generator maintenance (A Check, B check,Etc)
can u tell me the promotion from oiller to enginer
what are the steps involved in generator load test?
what is sevice settings for mccb?How can be it setted?
I want to make street light with solar system ... What may I do for procedure and how much of estimation for each material ... If any one knows guide me and inform this id : aravindd7@gmail.com
what is meant by carrier aided trip protection in transmission line
how current is reverse from its normal direction during the fault?
Please tell me the formulaes while designing a substation for power Calculations in designing a 33 KV Substation?????
Where voltage are high and current to be interrupted is low the breaker preferred is:
is that a problem if i connect a single phase load to a secondry delta connected transformer but i get a neutral from other transformer i the system?