Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


How to find Cable size?
Caterpillar generator produce (Two generators) 127*2=254 amp
at 11 kv .
What would be the cable size (XLPE) to supply 256 amp at 11
kv? Air or surrounding Temperature is 32 degree C. Cable
will go under ground at 2.5 feet depth. Group Rating Factors
is 3 cables. Clearance between cables is 7 cm. Soil
Temperature (Ambient) 28o C Soil Thermal Resistivity is 1.2
K.m/W


I would like to use 3 separate single core instead of using
3 core cable.

Some says I should use three separate single core 120RM cables.
Some says 70RM .some says 95.
I m totally confused.
Is there ant specific rule to determine cable size?
What would be the LT cable size to flow 500 Amp current?
Ifte
My e mail address is ifte13@yahoo.com
Anyone please send me the answer to my e mail address,
i will be very glad.



How to find Cable size? Caterpillar generator produce (Two generators) 127*2=254 amp at 11 kv . W..

Answer / muhammad qasim

Dear, All those specification you described in your question
are cared while manufacturer design their product. Designing
contains many complex parameters to be cared while deciding
about the metallurgy, insulation. All good manufacturer care
worst operating conditions when they design their products.
When we go for their usage in industrial sector, main things
we need to assure are that:

1- Current Raging
2- Voltage Drop should not exceed the permissible level
3- Cable should have withstanding capability for transient
short circuit and thermal capability.

Normally, copper have current density of 1000 A/Sq inch
which becomes 1.8 A/Sq mm. and all cable and bus bars should
be designed 150% of operating rating for safety purpose.

Secondly, Conductor area is not affected with voltage level,
50 A at HT or LT shall require same conductor area but
insulation level shall be affected. For HT you need XLP and
for LT you need PVC-PVC cables.

Further if you get better answer please copy the same to
muazmi02@yahoo.com

Regards

Is This Answer Correct ?    4 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

what is the electricity

3 Answers  


I hv a question regarding power factor improvement just after transformer. I request you to reply me plzz. thank you sir. My friend has a small unit of fabrication. in his factory the main load is a welding machine, lathe machine, grinding machine. this load is not continuous type. now our electricity board has installed 16 KVA, 11000/433 V transformer for our factory. In the energy meter (trivector meter) at LV side of transformer, i hv seen power factor value of 0.15 only when only 3 KW load was flowing. Further electricity board has suggested to install 4 KVAR capacitor at LV side after energy meter. Now my question is that if we permanantly install and switch on 4 KVAR capacitor after energy meter, during some load on transformer and also without any load on transformer, wht will be the power factor shown in energy meter?i dont want to get any penalty by electricity board, so plz suggest me if i can permanantly install and switch on the 4 kvar capacitor or not at LV side of transformer just after energy meter? Thank you again and awaiting for ur positive reply soon.

9 Answers  


how we can improve power factor from 0.8 to 0.85 or 0.9 & how we identify its either lag or lead ? thank you

7 Answers  


what is phase and neutral.

2 Answers   Birla,


Why compensation is necessary in feedback control system?

0 Answers  


working of diesel generator ?

0 Answers  


how we can decide that what value of ht line will come to any commercial building? (ans except According to the building load)

0 Answers  


Explain the operation principle, advantages and disadvantages of the following converters: a) A 12 pulse converter b) A Switch-mode inverter c) A thyristor inverter

0 Answers  


there are a transformer and a motor. both are connected to 3phase, 415 Volt, 50Hz power supply. Both are working with induction principles. Then, why, motor is rotating and transformer is not rotating.

8 Answers  


why free wheeling diode is connected across inductive load

16 Answers   NTPC, Omaxe, Wipro,


What is the Difference between Ac Drives and Dc Drives? According to application, speed, Torque, cost, Reliability, Construction, Motor etc... Thankyou !!!

0 Answers   IFFCO, IIT,


Why dont we get shock while testing for voltage with a line tester? How the bulb inside the tester glows while testing with tester coz we are totaly isolated from earth or we are not giving close path for the current to flow?

3 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)