How to prepare electrical preventive maintenance plan &
shedule of machine tools.
Answers were Sorted based on User's Feedback
Answer / rajiv mahajan
first of all make a list of all machines . make a schedule
of year. divide your all machines as weekly. you can divide
your machine in 4 groups . one group will be for preventive
mainteance in once in month or some time twice.
Is This Answer Correct ? | 7 Yes | 0 No |
why cable i burning without tripping. how can protect led street lights
what is the soft starter principle? how is connection diagram? what is the procedure for checking the connection?
What r the specification furnishid in motor name plate?
what is meant by 3rd hormonics ?
why the transformer neutral earthing is to be done by copper flat only,if we use GI flat what is the disadvantage.
how do you test tachos and servos
what material is the electrical housing wire made of? is there any difference for the telephone lines?
I have a 33 KV sub stn with two mother transformers 33/11 KV of capacity 3150 and 1600 KVA respectively. The total connected load 16809 KVA(11/0.433KV).how i calculate the max current & how i decided the CMD.
If we need 4c× 50mm sq cable but it's not available so we can pull 4c×25mm sq two cables?
What do you mean by passive circuit elements and why these are called passive?
what is the difference between arc and spark
WHAT IS THE SIGNIFICANCE OF VECTOR GROUPS IN TRANSFORMER? WHAT WILL BE EFFECT WHEN PHASE DISPLACEMENT CHANGES IN TRANSFORMER?WHAT IS THE NEED TO BE PHASE SHIFT CHANGE BETWEEN THE PRIMARY AND SECONDARY WINDING