Hi, I want to import my Transport request from DEV. to Test
system (from STMS buffer of DEV.(domain only) but I don’t
want Login/PWD screen while importing from DEV to Test
System. But I need login/pwd screen while importing TR from
Test to PRD system. Presently I have activated all systems
as a non trusted systems. If any one has idea please let me
know. Thanks in advance! Regards, Raj Chavan.
No Answer is Posted For this Question
Be the First to Post Answer
Users are lockdown from past 3 -4 months. Which table is used to know that which users are lockdown?
How to create secatt script in sap step by step
What is difference bewteen 4.7 ,ECC 5 and ECC6 from SAP Securtiy point of view
what are the prerequisites we should take before assigning sap_all to a user even we have approval from authorization controllers ?
what is the difference between se16 and se16n ?
What do you mean by ** Generated password is not downward compatible** ?
How will remove all expired role assignments to number of users ?
can you please send me SAP Security upgrade documents and guide for CRM 5 and CRM 7 and what are the differeces between crm 5 AND crm 7 according to sap security point of view.
what is user master record and what it contains?
What is the maximum number of authorization in an object?
What is difference between two sentences 1: " Using SUGR we allocate user to group ". 2: " In SU01 in Logon data we assign user to group " So, What is assigning and allocating ?
Mwhat is the maximum number of profiles in a role and maximum number of object in a role?