Answer / khalidshaikh
FIRST OF ALL DISCONNECT THE SOURCE OF SUPPLY, MOSTLY FIRE
OCCURED DUE TO THE ELECTRIC SHORT CIRCUITS.
THEN CALL OTHER RESCUE WORKERS, IF I AM FIRE TEAM MEMBER
THEN I MUST KNOW THE CLASSES OF FIRE AND USES OF FIRE
EXTINGUISHERS.
Is This Answer Correct ? | 4 Yes | 0 No |
Answer / bmw6633@gmail.com
if i am the memeber of fire hazard teem then i will let all
the people away from the area i will see wat type of fire is
it if is oil base it should be use (dcp)co2 fire extinion.if
it is electrical (DCP)fire extintion is used,for wooden or
paper waste fire we should use sand or water.
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / bmw6633@gmail.com
if i am the memeber of fire hazard teem then i will let all
the people away from the area i will see wat type of fire is
it if is oil base it should be use (dcp)co2 fire extinion.if
it is electrical (DCP)fire extintion is used,for wooden or
paper waste fire we should use sand or water.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / arun kumar
If it is a alarm ,as a member of ERT or Maintenance/management team,We should first analyse whether it is Real or false alarm by checking the fault zone indicated in the FA panel .It could be false alarm due to dust collection in detector or some other reason ,such case follow your organisation procedure and reset it ,'
If its a real fire and alarm ,do the possibility with you like if we are ERT member or trained ,inform first your seniors and Paralaly try to extinguish the fire with Extinguisher/Hydrant system and also switch OFF the Power supply . Operate the MCP ,so others you can make alert and announce in PA system about the fire and to Evacuate the Building .
If you are not having any knowledge of Fire system ,first you evacuate the building and inform management for the proper action .
Is This Answer Correct ? | 0 Yes | 0 No |
What is the difference between PS & metering CT (5p20,0.5 etc.)? Why in PS class CT only Vk is given ? Is PS class CT is more accurate than metering CT?
I am an electrical engg and has got selected in wipro should i go there now or try in some core company ?
why three phase system is not preferred in aircrafts power cckts if yes than explain reasons?
what to do with nuetral when Generators are running in parrellel
What is the requirement of grounding the neutral of single phase generators on load? If the neutral is not grounded, what will be the effect?
what is different between DIGITAL and ANALOG?
what are the types of cooling systems used in motors?
Where is 2 phase supply used commercially?
what is the KVA formula of a three phase transformer
Whether earthmat designning is done only for sub station or it can be done for multy residential complexes also? What is the size, type & arrangement of the earth grid to be done?
when the direction of a 3phase induction motor is reversed , is there any losses increases?
defination of generator