Answer Posted / arun kumar
If it is a alarm ,as a member of ERT or Maintenance/management team,We should first analyse whether it is Real or false alarm by checking the fault zone indicated in the FA panel .It could be false alarm due to dust collection in detector or some other reason ,such case follow your organisation procedure and reset it ,'
If its a real fire and alarm ,do the possibility with you like if we are ERT member or trained ,inform first your seniors and Paralaly try to extinguish the fire with Extinguisher/Hydrant system and also switch OFF the Power supply . Operate the MCP ,so others you can make alert and announce in PA system about the fire and to Evacuate the Building .
If you are not having any knowledge of Fire system ,first you evacuate the building and inform management for the proper action .
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
With a phasor diagram show the effect of increasing the field current of a generator supplying a constant real power and connected to a grid system.
If there are two transformer having rating of 2.5mva, 6.6kv/440v(satr-star),and the load is 600kw then what is better to maintain less losses in transformer having both transformer in parellel or only single transformer connected to load? Please give calculated answer
how to get electrical supervisour certificate in gujarat
WHY MOSTLY Rph IS USED FOR CONTROL CIRCUITS AUX. SUPPLY ?
what will happen if there is a voltage leakage or current leakage in an electrical train
As per standard, transformer body earthing and other Equipment earthing (Equipment earthing) did not connect. but in LT side termination we are doing metal glanding in both side Transformer to PCC Panel through armoured cable, now X'mer body earthing and PCC Pane earthing (Equipment earthing) both are connect.is this safe for X'mer or other equipment?
What is the need for a controller?
WITCH CARDS IN USE IN FIRE CONTROL PANEL.
What is difference between Harmonic and Non harmonic Capacitor Bank?
i have been tasked with a design of protection, metering and control(PMC) relay panel extension to accommodate all PMC relays.There is an already existing panel where this one will be built.What are the design aspects for this kind of project? thank you.
Formulae for calculating the transmission line losses for different voltage levels
Explain the method to keep noises low in a control system?
hi frds, i m electrical engineer.can i get cdr for electrical engineer if u have then send me on my mail id its jayesh_ee88@yahoo.com.please help me frds
Electrical 'C' license full abbreviation , and full form
How we can defined theecopper cable size if we know the aluminium cable size?