what is Tracebelity Matrix?
Answers were Sorted based on User's Feedback
Answer / mercurytsl
It's a mapping between requirements and test cases..
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / jayanthi
Mapping Requirements to Test Cases is called Traceability
Matrix
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / snehagirish
Once the writting of testcase is completed,the test
engineer will send the testcase for testlead to verify...
now the testlead will prepare Tracebelity Matrix to veriy
wheather all the requriments are covered or not by mapping
the requriments with the testcases available...so he can
easily find if any of the testcase is missing for
particular requriment.
Correct Me if iam wrong
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / b g suresh
In software Testing, the Traceability Matrix can be a
document to trace the connectivity/integration/dependency
between the Requirements->Test scenarios->TestCases-
>TestResults.
Its a document to trace the completes of the Testing
process as per the requirements.
Traceability checks whether all the requirements are
covered in the Test cases.
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / jigneshk
traceability matrices is mapping between user's requriment
with test case prepared by tester main purpose of
traceability metrics is all the req. given by user are
covered in test cases or not which is helping to check
maximum testing covrage of application
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / ruchi
i think ,,tm is way of mapping the the right way of requirments with the user need ,and specification ,to the ,test case ,enviorment .so that if any unambigous data or info part is there it can be omitted and prefered to suitable place
as a dummy data.
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / sreedhar
Hi all
TM is a document which contains a Table of linking information and used for tracing back for the reference in any kind of questionable or confusion situations.
| Is This Answer Correct ? | 0 Yes | 1 No |
Answer / vinoth kumar
Hai all....
IT KEEPS TRACK OF REQUIREMENT THROUGHOUT THE PHASES
OF SOFTWARE DEVELOPMENT LIFE CYCLE WHEREBY IT IS EASIER TO
FINED THE DIFECT EARLY IN THE LIFE LIFE CYCLE & LESS COST
TO CORRECT THE DIFECT & DEFECT RATIO IS ALSO REDUSE BECAUSE
OF THE TRACEABILITY MATRIX.
Ok...
by...
| Is This Answer Correct ? | 0 Yes | 2 No |
When do you prepare Requirement Traceability Matrix(RTM) before testing aor after completion of testing?
14 Answers AppLabs, IEG, Satyam,
Can anyone give me the example of High Priority and High severity defect. Please dont give me answers like Spelling mistakes or logo missing something like that. Give me some real time example from your application. Thanks in Advance.
What are all the things ur going to keep in mind while System testing?
What is the priority in fixing the bugs? Explain the severity u rate for the bugs found?
what is difference between test strategies and test data ?
what is cross project reference what is entry and exit criteria for login page.
what the diff b/w verification and validation
8 Answers College School Exams Tests, SunGard,
What is the difference between Quality Plan and Test Plan Anybody can give answer..Thanks in advance...
What is unit level testing?
What is the Desktop Testing?
only one tester & one developer ,the product is released to be today night.if you found a critical bug then wat u do