how to calculate the steel for rcc slab?
plz tell me the formula for calculating the steel?
Answers were Sorted based on User's Feedback
Answer / fayaz
Formula = 24.89 x 4.9 x Quantity of RCC in M3 = Required Mild steel in ton
2204
Is This Answer Correct ? | 14 Yes | 7 No |
Answer / sri
practically for slabs steel is caluclated in this manner:
for a given room of size 6.5x5.2,first we provide main reinforcement in shorter span and distribution steel in longer span.so,here we provide main reinforcement in breadth side(i.e... 5.2m side).and distribution in other side.so,we preapre a tabular form for a given spacing and dia of steel.
then we caluclate no of bars.therefore,no.of bars=length/spacing.next bar length is caluclated according to sections given.i mean there will be given different sections for rooms and given a brief diagram for steel placing.so both top mat and bottom mat we caluclate the bar length.for both main and distribution steel.to find qty=bar lengthxno.of barsx((dxd)/162)xunit weight of steel.here note that length and bar lengths are different.length means room size and bar length means length of bar with projections inside the room.
l spacing no dia barlength qty
main steel:
top mat 6.5 0.15 44 10 this is acc to
section
bottom mat 6.5 0.15 44 10 5.2+0.23+0.2
distribution steel:
top mat 5.2 0.2 26 8 6.5+0.23+0.2
bottom mat = 0.2 8 6.5+0.23+0.2
=same as main steel top mat
here 0.23 is wall thickness.so both sides 0.23 means we take one 0.23 and add bending value as 0.2 in most cases
Is This Answer Correct ? | 17 Yes | 11 No |
Answer / aman singroha
calculate volume of steel by using formula (3.14*r2*h).
calculate volume of diff. dia bars used in steel and add
them. it will the steel used in the slab.
Is This Answer Correct ? | 11 Yes | 6 No |
Answer / mahammad jabeer p
Reinforcement
Plinth Beam 140 Kg / Cum
Footing 75 Kg / Cum
Pedestal 140 Kg / Cum
Square Column 150 Kg / Cum
Circular Column 150 Kg / Cum
Sloped Slab 8 Kg / Sqm
Flat Slab 8 Kg / Sqm
Shade 6Kg / Sqm
Lintels 110 Kg / Cum
Is This Answer Correct ? | 7 Yes | 2 No |
Answer / abdul hadi
ast=(0.5fck/fy)(1-root of(1-4.6mu/fck*b*d*d))b*d
Is This Answer Correct ? | 5 Yes | 2 No |
Answer / kuldeep bakshi
the qnty of steel will depend upon the design of slab however as a thumb rule 140kg per 100sqft of rcc can be considered keeping in mind rcc beams to be casted monolithically with rcc slab
Is This Answer Correct ? | 11 Yes | 9 No |
Answer / ravichander varma
bar bending schedule is the solution .... and some BBS softwares easing our work..
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / arbaz shaikh
can any1 help me out please for quotation of project its 2 basement g +22 at mumbai andheri i can mail u the plan and basic details please help me out i am ready to pay some amount.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / an lb
0.5x20/415-(1-√1-4.6x250.47/20x300x550^2) x300x550
Is This Answer Correct ? | 0 Yes | 0 No |
Why we used ther red bricks for construction..
HOW TO MIX M20 GRADE CONCRETE BY HAND? USING BOND.
i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard
brick size-230x110x75, how many no of bricks cover 1cubic meter.
what"s the formula for circumference?
can any one explain structural behaviour of trapezoidal combined footing?
How much is the cover for slab?
How is the strength of cement measured?
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
how many type of admixtures for water stored structure?
How do we calculate the building footing calculation ?
WHAT IS DIFFERANCE BETWEN TOR STEEL AND TMT STEEL