how to decide the column size and dia of the bar
Answers were Sorted based on User's Feedback
What is the maximum allowable wastage in pouring of Ready Mix Concrete received at location with transit mixtures. Work scope includes both Direct Pouring & manual pouring.
1 Answers AKM Construction Management,
what is the constant weight of the 6mm,8mm,10mm,12mm,20mm,25mm etc.............dia bars in 1meter
howto calculate the quantities of material used in fly ash brick after finding the volume??
9*9 1:4:8 ratio using how to calculate the material for 40mm aggregate ,cement &sand please tell me answer
How do you calculate reinforcement weight of steel?
how lap length is increased with increase of Grade of steel?
Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.
how to calculate the quantity of cement,sand and aggregate when the ratio of mixing is 1:2:3
0 Answers Ajnara Group, Assosa University,
HOW MANY CEMENT BAGS ARE REQUIRED IN 1 CUBIC METER
11 Answers Bharat Construction, CPWD, Ircon,
how we control the temperature during concreting ?
what is difference between footing and foundation?
Is there a necessity for providing expansion joints in long RCC structure(say a wall of a water retaining structure)- say approximately 50 metres in length and about 4 metres high? What will be the limitations?