practically for slabs steel is caluclated in this manner:
for a given room of size 6.5x5.2,first we provide main reinforcement in shorter span and distribution steel in longer span.so,here we provide main reinforcement in breadth side(i.e... 5.2m side).and distribution in other side.so,we preapre a tabular form for a given spacing and dia of steel.
then we caluclate no of bars.therefore,no.of bars=length/spacing.next bar length is caluclated according to sections given.i mean there will be given different sections for rooms and given a brief diagram for steel placing.so both top mat and bottom mat we caluclate the bar length.for both main and distribution steel.to find qty=bar lengthxno.of barsx((dxd)/162)xunit weight of steel.here note that length and bar lengths are different.length means room size and bar length means length of bar with projections inside the room.
l spacing no dia barlength qty
main steel:
top mat 6.5 0.15 44 10 this is acc to
section
bottom mat 6.5 0.15 44 10 5.2+0.23+0.2
distribution steel:
top mat 5.2 0.2 26 8 6.5+0.23+0.2
bottom mat = 0.2 8 6.5+0.23+0.2
=same as main steel top mat
here 0.23 is wall thickness.so both sides 0.23 means we take one 0.23 and add bending value as 0.2 in most cases
| Is This Answer Correct ? | 17 Yes | 11 No |
Post New Answer View All Answers
What is GSB gradation
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
How to do bbs in excel format
how to calculate testing date
Which is the direction of negative angle?
What is meant by scaffolding coefficient?
The largest size of paper used in plotter to print the drawing made by Autocad .
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
What is the difference between Rock And Murrum. How to claim that excavated material is not a murrum but rock.
What is the difference between undo & redo?
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel
How to improve the strength of fly ash bricks to avoid corner damge? How to get the color lighter similar to normal concrete blocks/