What are the different pre-commissioning tests that are
performed on the distribution transformer, power cable and
switchgear (11kv)?
Answer / pillay
Most importantly the insulation and HV holding test is done on
all the installations.
on the tx former;winding insulation test,
ratio test, vector group test,impedence test, oil dielectric and
other test,
bucholtz relay test, all protective equipments operation test,the
switchgears insulation and conductivity tests along with pressure
tests on cables also . all tests have to meet the local
requirements or as relevant BS.
| Is This Answer Correct ? | 15 Yes | 3 No |
How to select the gauge of wire for winding of motors? How to select number of turns for winding of three phase induction motor?
which type of motor we are using in local train???
4 Answers Asia MotorWorks AMW,
wat is meant by PX class in ct?
Dyn1 transformer vector group testing how to do
Why are the voltage levels in a powersystem are 11KV,33KV etc., why not 10KV,30KV?
why we used capacitor in induction motor?
what is the range of thermal overload and over current. Answer should be in percentage of current.
which of the following loss varies with the load a)hystresis loss b)eddy current loss c)copper loss d)core loss
how was the induction stove working?
What will happen if the rotor circuit of a slipring I.M. is kept open & electric supply is given to its stator winding.
What is the functaion of IGBT in UPS system?
how the aircraft outer body and inner body is separated ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)