What are the different pre-commissioning tests that are
performed on the distribution transformer, power cable and
switchgear (11kv)?
Answer Posted / pillay
Most importantly the insulation and HV holding test is done on
all the installations.
on the tx former;winding insulation test,
ratio test, vector group test,impedence test, oil dielectric and
other test,
bucholtz relay test, all protective equipments operation test,the
switchgears insulation and conductivity tests along with pressure
tests on cables also . all tests have to meet the local
requirements or as relevant BS.
Is This Answer Correct ? | 15 Yes | 3 No |
Post New Answer View All Answers
th how could we differentiate between armoured copper and armoured aluminium cable what is the basic application? why we prefer the armoured copper as compared to armoured aluminium.
What is reverse power relay?
The D.C. spark test is applicable to single conductor cable & assemblies of insulated single conductor cables without insulation shield,metallic sheath or metalic armor?
solar inverters was not connected to the nuteral link .this nutwral possible to any other systems
Q.1:What protection will be used on HT and LT side of 33/0.4 KV, MVA transformer. Indicate capacities of protective device to be used. Q.2:Which types of back-up protections are used in the power transformers? What do you understand by the term over travel in the relay? Q.3:How star and delta connected winding transformer are provided from earth fault
What is the meaning of 40X8X2 busbar dimensions for carring load of 400 Amps
What is online and offline ups? how does it works?
What is meant by bus bar protection?
How can I calculate per unit (KWH) fuel (Gas/ Diesel both) consumption 1MW unit?
what is the difference between 2 way and 4 pole selector switch???
What are your future plans for the company if permanently employed?
How to do cable earhing? whether by grounding Armour to ground or by running extra G.I wire along with cable? which one is preferred mostly amoung them? If the second one is more preferable how many GI wires to be run along with cable (1 or 2)?
What is the maximum and minimum rating of UPS?
what is meant by the phrase 'static load' in case of shorting in a generator excitation system?
how tto ingress mw in turbine explain.procedure ?