What is Pavement & carrage way?
Answers were Sorted based on User's Feedback
Answer / m.chandra shekar
PAVEMENT includes road for vehicular traffic, foot path, shoulders...
CARRIAGE WAY is the part of pavement used for vehicular traffic movement...
Is This Answer Correct ? | 27 Yes | 4 No |
Answer / vinayak
Pavement- it s a structure that consists of different layers made up of composite materials laid evenly on a prepared natural soil sub grade.primary function of pavement is to distribute v load stresses evenly over lower layers.
carriage way-middle part of pavement used for vehicular traffic movement.
Is This Answer Correct ? | 11 Yes | 0 No |
Answer / liton1_06
pavement:-same meaning of carriage way, surface of road.
carriage way:- The width of the roadway constructed for the
movement for vechilcular traffic is called carriage way or
pavement.
Is This Answer Correct ? | 14 Yes | 6 No |
Answer / s.p. singh
carrage way is indicates the portion of road awailable for the moovement of traffic & pavement is the part of crust for road it has mainly two types 1- flexible pavement 2- rigide pavement.
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / narendra
(from wikie)
A Pavement:- the durable surfacing of roads and
walkways ("road surface" in British English)
A carriageway is the part of a road that will
actually carry vehicle traffic.
• the carriageway surface is called the pavement (in
American English)
Is This Answer Correct ? | 4 Yes | 2 No |
Answer / s. k. rao
Any material or materials stronger than natural ground and
laid over it in layers to protect it from being
overstresssed due to vehicle loads is pavement.
Carriageway is the demarcated middle part of pavement
surface of sufficient width intended for vehicular traffic
movement.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / santosh
pavement: tha top surface width of road which constructed
by hard material & its primary function is to provide non
interrupted way moving of vehicles only.it also termed as
carriage way as it is made for movement of vehicles only.
Is This Answer Correct ? | 3 Yes | 6 No |
What are your future hopes for this job?
How to arrive dry volume of concrete (1.52 to 1.57) ?
this is jagdesh from vizag, IM GOING 2 ATTEND BHEL interview on 14th dec. im a civil engg. graduate. plzz let me know the pattern & few questions of the interview if possible. plz reply at jd_marc@yahoo.com
1 building project (work in progress) and following are sum detail about his project 1) Using local rebar grade 415 2) Total built up area- 60000 sq.ft 3) Floors to be constructed – 21 storey 4) Estimated requirement of Steel per sq. foot – 7KG/sq.ft 5) Concrete grade – M35 6) Rebars mainly required (sizes)- 16,20,25,32 & (8 mm for stirrups) Wanted to ask u if this person uses 500D…what are the benefits he will be getting? Whether his per Sq. foot consumption can b reduce? If yes den around how much?
what are the diffrent kind of grades in concrete and what does M means while specifyng the grades?
What is the factor of safety in civil engineering
what is a moisture correction
2 Answers ITC Infotech, Unity Infraprojects,
what is project?
pls explain me the design procedure of multistorey building including structural analysis and also with example by considering the effect of wind load and earthquake load ?
minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?
we have a texmo make submersible water pump 5hp 10 stage what will be the total head & is it any thumb rule for calculating the head please reply urgently
What is the volume of sand in per cubic meter if we have a design mix of concrete is 1:2:4 (by volume).