What is Pavement & carrage way?

Answers were Sorted based on User's Feedback



What is Pavement & carrage way?..

Answer / m.chandra shekar

PAVEMENT includes road for vehicular traffic, foot path, shoulders...

CARRIAGE WAY is the part of pavement used for vehicular traffic movement...

Is This Answer Correct ?    27 Yes 4 No

What is Pavement & carrage way?..

Answer / vinayak

Pavement- it s a structure that consists of different layers made up of composite materials laid evenly on a prepared natural soil sub grade.primary function of pavement is to distribute v load stresses evenly over lower layers.

carriage way-middle part of pavement used for vehicular traffic movement.

Is This Answer Correct ?    11 Yes 0 No

What is Pavement & carrage way?..

Answer / liton1_06

pavement:-same meaning of carriage way, surface of road.
carriage way:- The width of the roadway constructed for the
movement for vechilcular traffic is called carriage way or
pavement.

Is This Answer Correct ?    14 Yes 6 No

What is Pavement & carrage way?..

Answer / s.p. singh

carrage way is indicates the portion of road awailable for the moovement of traffic & pavement is the part of crust for road it has mainly two types 1- flexible pavement 2- rigide pavement.

Is This Answer Correct ?    3 Yes 0 No

What is Pavement & carrage way?..

Answer / narendra

(from wikie)
A Pavement:- the durable surfacing of roads and
walkways ("road surface" in British English)
A carriageway is the part of a road that will
actually carry vehicle traffic.
• the carriageway surface is called the pavement (in
American English)

Is This Answer Correct ?    4 Yes 2 No

What is Pavement & carrage way?..

Answer / s. k. rao

Any material or materials stronger than natural ground and
laid over it in layers to protect it from being
overstresssed due to vehicle loads is pavement.

Carriageway is the demarcated middle part of pavement
surface of sufficient width intended for vehicular traffic
movement.

Is This Answer Correct ?    1 Yes 0 No

What is Pavement & carrage way?..

Answer / santosh

pavement: tha top surface width of road which constructed
by hard material & its primary function is to provide non
interrupted way moving of vehicles only.it also termed as
carriage way as it is made for movement of vehicles only.

Is This Answer Correct ?    3 Yes 6 No

Post New Answer

More Civil Engineering Interview Questions

What are your future hopes for this job?

0 Answers   Jaycon,


How to arrive dry volume of concrete (1.52 to 1.57) ?

0 Answers  


this is jagdesh from vizag, IM GOING 2 ATTEND BHEL interview on 14th dec. im a civil engg. graduate. plzz let me know the pattern & few questions of the interview if possible. plz reply at jd_marc@yahoo.com

0 Answers  


1 building project (work in progress) and following are sum detail about his project 1) Using local rebar grade 415 2) Total built up area- 60000 sq.ft 3) Floors to be constructed – 21 storey 4) Estimated requirement of Steel per sq. foot – 7KG/sq.ft 5) Concrete grade – M35 6) Rebars mainly required (sizes)- 16,20,25,32 & (8 mm for stirrups) Wanted to ask u if this person uses 500D…what are the benefits he will be getting? Whether his per Sq. foot consumption can b reduce? If yes den around how much?

1 Answers  


what are the diffrent kind of grades in concrete and what does M means while specifyng the grades?

10 Answers   Gammon,






What is the factor of safety in civil engineering

3 Answers   L&T,


what is a moisture correction

2 Answers   ITC Infotech, Unity Infraprojects,


what is project?

0 Answers   PMC,


pls explain me the design procedure of multistorey building including structural analysis and also with example by considering the effect of wind load and earthquake load ?

1 Answers  


minimum number of bars in a beam? minimum and maximum column size and beam size ? minimum and maximum aggregate size used in multistorey residential building for columns,beams,slabs?

0 Answers   bscpl,


we have a texmo make submersible water pump 5hp 10 stage what will be the total head & is it any thumb rule for calculating the head please reply urgently

3 Answers  


What is the volume of sand in per cubic meter if we have a design mix of concrete is 1:2:4 (by volume).

5 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)