How you can implement new production order type?
Answers were Sorted based on User's Feedback
Answer / hemant baviskar
1. Define order type - OPJH
2. Assign serial number
3. Order type dep. parameter - opl8
4. Scheduling parameter - opu3
5. Confirmation parameter - opk4
6. Availability check control - opjk
Thanks
Is This Answer Correct ? | 13 Yes | 2 No |
Answer / arun k
1.define order type - opjh
2.order type dependent parametere - opl8
3. Scheduling parameter - opu3
4. Confirmation parameter - opk4
5. Availability check control - opjk
Is This Answer Correct ? | 0 Yes | 0 No |
Mention what are the types of master views for production and planning?
How are time management and payroll are integrated?
Do you have several alternative BOMs for a material, depending on the manufacturing procedure or lot size, for example (multiple BOM)?
Do you use other validity types (such as serial number, time period, or customer) in addition to the "Valid from" date to control the validity of your BOM changes?
Explain what happens to plan after it has been converted into production order?
Explain about rough cut planning
What is Phantom Assembly?
Can't one material be assigned to more than one operation in a routing?
For REM the settings are dependent or normal?
What is routing in sap pp?
what is the capacity planner ?
How requirements( pir, sales order, customer requirement) are reduced after they are produced?