Can I include the parameters like cost centre,plant.account
assignmnet category,purchasing group in PR release strategy
with classification which is at header level????
Answers were Sorted based on User's Feedback
Answer / ravi shankar
Hi,
You can select above mentioned parameters in PR release
strategy provided these parameter should be there in your
CEBAN communication strature of the PR.
Regards
Ravi shankar.
Is This Answer Correct ? | 19 Yes | 3 No |
Answer / azamgtl
Perhaps u can use the fields which are mentioned in CEBAN
structure in standard module, if it is not mentioned , u
can go for customizing ,,i.e by using USER EXITS.
Is This Answer Correct ? | 4 Yes | 2 No |
Answer / sagar
You can use all fields, which are available in the filed catalog of CEBAN. Also, you add require field as per the requirement with the help of ABAP.
In PR communication structure, CEBAN Cost center, Purchasing group, Plant and account assignment category already available. So, You can define release strategy at header level.
Is This Answer Correct ? | 0 Yes | 0 No |
Explain org structure in purchasing in sap mm.
What are the tables are available for PO & Material master?
Accounting keys trigger in intercompany sto for one step and two step???
Explain the types of project stocks in sap mm
Explain full cycle
what is the difference between new developed Zreports and Ztransctions codes.give me example on mm pls thx alot
What are the levels at which a batch number can be configured?
i wani to SAP MM module and i have an experience of near abopu 4 years in SAP MM as a end user.so want to begain my career in sap functional,so pls suggest me a good institute which cost me around 30 k. i cant afford huge amount like siemans offer.
What are release procedures with and without classification?
how to give another test sample to quality on same material after few days? pls tell me with transaction code????
What are the different sections in vendor master data?
Under which business scenario split valuation is used?