how to know whether the bug is valid or invalid?
Answers were Sorted based on User's Feedback
Answer / rahul1st
when somthing is not functioning as per the requirement
than its bug.
| Is This Answer Correct ? | 9 Yes | 2 No |
Answer / simran
If the correct test steps are performed with correct test
data and the actual result is not matching the expected
result.
| Is This Answer Correct ? | 7 Yes | 2 No |
Answer / huhuhuhuh
if u cant produce bug the second time u test it then it is
not a valid bug
and if a tester is assuiming the req wronlgythenit is not a
valid bug
the valid ofthe bug is determined by the test lead
| Is This Answer Correct ? | 0 Yes | 1 No |
Answer / saurabh mishra
Some times valid bugs existed in the SRS (document) and it
could be willingly or unwillingly, therefore, go through
SRS properly and discuss with TL and Project Manager.
| Is This Answer Correct ? | 1 Yes | 3 No |
Answer / akshay
sometimes the person who prepares the testcases makes
mistakes that is what we call discrepancy in test case . At
that point the tester needs to refer SRS- software
requirement specification document which is purely made for
the client purpose what the client needs .
so if your expected result is matching with testcase but
not with SRS then definitely there is a discrepancy in TC
and that is a valid bug.After all we work for client
correct me if i am wrong
Thanks
Akshay
mail me : akshay_bali2001@yahoo.co.in
| Is This Answer Correct ? | 1 Yes | 3 No |
Answer / ammu
test team leader can decide bug is valid or invalid
| Is This Answer Correct ? | 0 Yes | 7 No |
How will you select the regression test case?
Can anybody describe what might be the reasons or situations where the developer doesn't accept a bug as a bug , raised by tester ?
Testing of Non-Functional requirements does not involove a) Performance tests b) Reliability tests c) usability tests d) Configuration tests
Write 2 scenarios for System testing?
When do we perform smoke testing?
My questions are- 1. If we have 1 week time in hand what will be the approch of testing. 2. If we have very lesstime in hand then how we will do the regration testing. 2. When there is a change in requirement in module A then what should be the approch to change in that module and in other module like B,C etc an whow we update the test case pls explain the scenario in detail. 3.How do you confirm that for perticular funtionality all the test cases has been written. Thanks
what is gap analysis
How to derive test requirements from SRS?
entry criteria and exit criteria for unit testing, integration testing, system testing and uat
What was a problem you had in your previous assignment (testing if possible)? How did you resolve it? (eswar)
How do we do Database testing?. How does our knowledge on SQL is useful in Database testing?. Please explain the process if possible.
What is Check list for review test cases ?