what is the minimum dielectric stregth of transformer oil.
Answers were Sorted based on User's Feedback
Answer / suresh
normally the testing kit is available for 2.5 mm airgap it
required 50 KV means lcm 200kv BDV value is required.
Is This Answer Correct ? | 7 Yes | 9 No |
A group of machines (wind turbines) connected with 33KV feeder and each machines are having individual VCB. The 33KV feeder connected with 110KV/33KV substation. The 33KV feeder tripped by over current at Substation and fault recorded at Substation as OC-R&Y phase. Same time the group of machines VCB tripped by over voltage, the fault recorded voltage was above 66KV by numerical Under/Over voltage relay. While grid drop time, this much of voltage hike is possible?
What is the purpose of taking Capacitance and Tan Delta Test in Transformer bushing?
we convert 66kv to 33 kv to 11kv to 440v. why can't we directly convert 33kv to 440 ?
In how we connect watt meter for open & short circuit test of a single phase transformer.
what is frequency? and its importance
Which modulation has higher data rates a.fm b.am c.qam d.qpsk
what type of protection used below 132KV feeders
11 Answers APTransco, Telecommunications, wbsedcl,
Could the power factor on electrical system can affect the registration of the kwhr meter or the CT/PT?
why ups rating in kva? and why ups are in parellel?.why isolation transformer is used in ups?
what is the use of cable in our environment ?
In EB metering we face problem kva jump even in no load condition.can any one help to control this
why rating of generator is kva but motor is kw ?