Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Why HT motor of 3.3 kw or 6.6 KV, one side foundation (
mostly non drive end ) keep insulated from ground ?

Answers were Sorted based on User's Feedback



Why HT motor of 3.3 kw or 6.6 KV, one side foundation ( mostly non drive end ) keep insulated from..

Answer / k.prakashchandra

To measure earth leakage current.

Is This Answer Correct ?    1 Yes 0 No

Why HT motor of 3.3 kw or 6.6 KV, one side foundation ( mostly non drive end ) keep insulated from..

Answer / 35201-1856474-7

safty purpose for human beings

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

what is the difference between interconnection and intraconnections in the circuit diagrams

0 Answers   NTPC,


why we ht line cable size small rather than lt cable.

4 Answers   Aster Teleservices,


How can claculate to attain the desired PF in the line ( HOW Much KVAR is required ) Pls Give the formula?

2 Answers  


what is the effect of back reactive power on the generator ?

0 Answers   MRF,


How to test the thyresitor or SCR by multmeter?

5 Answers   ABB,


Is it possible we are step down 11 kv to 230v ?

2 Answers   Fedco,


Wht ar the reason for low voltage on consumer side?

6 Answers  


A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram

0 Answers  


What are the types of excitation system?

0 Answers  


How would we calculate the no of earthing pits required for motor /panel

5 Answers   APGenco, National Engineering Industries, Practical Viva Questions,


what happens if earth of 33kv cable is not connected to earthing pits? please send this query's answer to ngrm.sudha249@gmail.com

0 Answers   Bhel, CFL,


what will happen, if both relay contact has live supply, and coil of relay activated

1 Answers   AVS,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)