While applying support packages, the error Table space
overflow is occured? What could be done?
Answers were Sorted based on User's Feedback
Answer / eswar
ohoo....
in such a case chk the table spaces in database level using
db02.if u r unable to login to system.add table space in
oslevel by useing sapdba or brtools and then reorganise the
database .
Thanks ,
eswar
Is This Answer Correct ? | 7 Yes | 0 No |
Answer / m.balarami reddy
U can see the OS note,, that may u can found
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / eswar
u mean spau and spdd.in this case take the printout of spau
and spdd and send it to functional consultent.after getting
confirmation u can apply support packs
Is This Answer Correct ? | 1 Yes | 2 No |
a transport request is imported, it should have finished in 30 min but it is running for one day(it is running in quality system and it has the transport directory local)you see the slog and all logs are showing that import is processing....and it does not show any error...how will you troubleshoot it?
I want to change five dialog work processes into batch. Where can I do this?
how do you troubleshoot when user complains that he ii not getting sap portal
How to increase tables space, resizing, backups and when will you do?
A role needs to be assigned to the end user as well as production manager. But only the production manager should have access to change the functional status and the end user should not. The role has the authorization key and status profile for functional location. please tell me how do we restrict the end user from changing the functional status, but the role needs to be assigned to both.
How can I restrict the user from printing?
Background jobs scheduling possible for operating system level in SAP Basis. discribe the details
Where the transport data files will be placed?
Hi ,All What is the multi-threading and max connections for rfc. Actually i am facing problem while send large amount of idocs to external system using middle ware tibco r3 adapter. And how to enable these in SAP ?
How you connect ECC to EP?
After Installation of the SAP software, its giving posting period 2004. I am not able to make it to 2009 financial year.. how we make it.. what are the activities we have to do ?
while scheduling backup in background using db13, which brtool activity runs?