IS THERE ANY JOBS FOR THOSE WHO ARE IN FINAL YAER OF
ENGINEERING(CIVIL) IN MUMBAI
No Answer is Posted For this Question
Be the First to Post Answer
What is unit weight of roadway layer.. 1.bitumen 2.sand 3.soil 4.concrete 5. aggregate give me some reference for this answers
Describe a time when you anticipated potential problems and developed Preventive measures
0 Answers Graham Construction,
if the length and breath of footing is 1.2m x 1.2 m what will be the length and breath of foundation trench
What are wooden shingles?
why +1 to be followed for calculating the no of bars in BBS. Please explain
wat is the optimum mix design for M25 grade of concrete ? is the ratio 1:1.5:3.65 correct?
how the load will be transfer from pile foundation to soil?
How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance
how to calculate shuttering design & position & quantity of props & type of method for succsessful work
how much quantity of cement,sand and water required for 1 sq feet flooring work .
why we leave expansion joint between to complex
Formula for calculating the weight of ismc 75