WHAT IS MEANT BY SUPERVISORY CONTROL?
Answers were Sorted based on User's Feedback
Answer / ibrahim s
This is nothing but SCADA(Supervisory Control And Data
Acquisition), this can used to monitor and control the
process variable along with PLC.
Is This Answer Correct ? | 11 Yes | 2 No |
Answer / raj anu raj
As the name implies, like a supervisor who supervise his
subordinates functions and control over them.
Particularly in SCADA(supervisory control and data
aquisition)from HMI ie.. simply from monitor screen u can
supervise the various functions in the plant and also
control them by changing set points etc.. .Usualy SCADA
comprises of PLCS(functions as supervisor in auto), a
communication mode to receive data to and fro and a manual
interface ie.. for example graphics to communicate with
the PLC
Regards
Is This Answer Correct ? | 9 Yes | 1 No |
Answer / khan
scada is abrreviated as supervisary control and data aqasition where the all data which monitered by the user is collected and aquared.the data can means what ever the set point acc to the program is can changed from it.
although the whole operation is monited by mmi man machine inteface first it send to the control unit then to the fild unit .
Is This Answer Correct ? | 2 Yes | 0 No |
How to convert 4 wire level transmitter connection to 2 wire.
Name different parts of a pressure gauge. Explain the use of hair spring in the pressure gauge.
How to measure density of oil in your kitchen. i.e indirectly to verify the quality of oil using min. gadgets available in the kitchen/house.
why do we use 4-20mA as o/p and why don't use 0-20mA or 5- 21mA?
two common seiling liquid used in seal pots are:
there are two candidates p and q in an election.During the campaign,40% of the voters promised to vote for P ,and rest for Q.however, on the day of election 15% of the voter went back on their promise to vote for P and instead voted for Q. 25% of the voters went back on their promise to vote for Q and instead voted for P.suppose,P lost by two votes,then what was the total no. of voters.
i am preparing for BARC ,so plz mail me how to prepare for BARC. ALSO IF POSIBLE SOME RELATED QUESTIONS. MY MAIL ID IS khushi_4uall2003@yahoo.co.in
Name and describe at least 4 status indicators, typically found on a PLC
why we cant transmit the dc current easily
how to online calibration of remote seal tx.
What should be the stanchan Height for installation of Smoke detector & toxic gas detector in field,according to qatar standard
what is gas metering system? gas chromatograph? and gas compressors?