What does the movement type control?
Answers were Sorted based on User's Feedback
Answer / manojkumarguin
All the inward and outward movement of material is
controlled by movement type for example for out bound
delivery we r using 601 movement type.Also it has an effect
on inventory control of stock .
thanks
manoj
Is This Answer Correct ? | 8 Yes | 0 No |
Answer / pia
Movement type controls the movement and formation of a
product.
By movement we mean - from where to where. E.g from vendor
to store, store to production, etc.
By formation we mean - the stages of a particular product -
for example from being used as a raw material to semi-
finished till the formation of finished goods.
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / mark
Movement Type controls:
1. Physical movement of material
2. Accounting for the respective movement
3. Invetory type of the stocks
4. Responsibility of the movement of the stock/material
Is This Answer Correct ? | 2 Yes | 2 No |
what is condition category, where its maintened
What is the sap landscape?
when we create a c.m.r we have four partner functions that is sp,sh,bp,py which one is mandatory? and if sp is mandatory but i want bp as mandatory, how its work? please tell me
Define the term consignment stock?
IN THIRD PARTY SALES CUSTOMER PLACE ORDER 10PC, P.O CREATED FOR 10PC BUT VENDOR ABLE DELIVER ONLY 8PC TO CUSTOMER THEN WE WANT UPDATE SALES ORDER TO 8PC THEN HOW WE WILL DO IT.
what is BADI? explain in detail.
In Intercompnay Billing scenario, Does Idocs get posted as we delivery is done from other plant and also the Intercompnay billing happens in the prcess. Though we have the same ERP system i.e. SAP only for all transactions.
What are the standard reconciliation accounts to be posted in CMR?
Status Profile I have a doubt in Status Profile. I have set the status profile and I can see the same in order, however please confirm if the authorized person now needs to approve it, how he will do that. I am testing it in IDES, not sure about the last step For example if it is VA01- Will he go to VA01 to approve it or reject it. Please suggest as I am not sure about the last step.
ANY ONE HAVING THE IDEA ABOUT CONFIGURATION SETTINGS FOR VARIANT CONFIGURATION WITH BOM.TEL ME THE STEP BY STEP CONFIGURATION.I KNOW VARIANT CONFIGURATION WITH OUT BOM CONFIGURATION
Incomplete log?
Is it possible to release change request, without releasing task.