In a Circuit how the MCB and Fuse ratings are calculated.
And shall the fuse follws the MCB or it is otherwise?
Answers were Sorted based on User's Feedback
Answer / pragnesh
IF we take an Example,
5.5kw Load,
I= Doble than Load = 11A,
MCB Must has More than 11A,
& Fuse Must than 1.5 Tmes more than MCB.
| Is This Answer Correct ? | 189 Yes | 98 No |
Answer / viraj dua
Dear all there are two parameters for determining the
selection of MCB
1.Type of load-
Resistive(e.g Home circuits)-B curve MCB(operates @
3-5 times the rated current)
Inductive-Motors etc.-C curve MCB(operates @ 5-10
times the rated current)
Highly inductive load-Transformers etc.-D curve MCB
(operates @ 10-15 times the rated current)
2.current in the circuit.
Now you will find that curve along with rated current is
mentioned on the MCB e.g. C6(do not confuse rated current
with the breaking capacity which is the max. current CB can
witstand)
C6 means this MCB is usable for Inductive load where
Circuit can witstand upto 30 Amps and MCB should trip if
Current Reaches 30 amps(5times of 6Amps)-60 Amps(10 Times)
Rated current is mentioned as 'ln' in electrical literature.
| Is This Answer Correct ? | 47 Yes | 6 No |
Answer / abdulsubur
IT CAN BE CALCULATED BY THIS FORMULA ALSO P=V I COS PHI
I=P\VCOSPHI FOR SINGLE PAHSE
I=P\1.732*VCOSPHI
| Is This Answer Correct ? | 53 Yes | 20 No |
Answer / daher
the current rating of the fuse must be equal to the load
because the fuses melting point disconnect the circuit if
the current load becomes greater than the specific rating.
in high ruputer capacity fuse,the fuse able to carry1.2
over the rating.meaning 20% more.MCB rating calculation is
to know how mush the consuption load and according to that
cal.we decide the rate of MCB from the catalog rating of
CB, must be more than the load.DONT FORGET THE SHORT
CIRCUIT CALCULATION
| Is This Answer Correct ? | 35 Yes | 13 No |
Answer / anil
there is different calculation for three phase and single
phase.
first you maintioned that it is either sigle or three
| Is This Answer Correct ? | 37 Yes | 19 No |
Answer / vignesh r
Under no load condition it is 20% of rated current of the
device.And in full load condition it is 120% of rated
current.For eg., consider the rated current of a motor is
19ampere.then under no load it is 20% of 19 =3.8ampere
=5amp(approx).for full load it is 120%of 19 = 22.8ampere=20
ampere(approx).
| Is This Answer Correct ? | 27 Yes | 9 No |
Answer / srihari
first we have to calculate the total load according that we
can use the formula whether it is single phase I=p/V cos(i)
or 3phase I=(P*L.F)/(1.732*V*cos(i))
for example if we get the value 20Amps, so we should choose
near to that value of rating MCCB(32A)
| Is This Answer Correct ? | 14 Yes | 3 No |
Answer / balaji venkateswaran.v
Sorry my answer is favour to you bu Your answer for that
question FUSE RATING is rejected by our college professor
| Is This Answer Correct ? | 33 Yes | 31 No |
Answer / daher
Use this formula for 3 phase: P=3*Vph*Iph*COSphi then
I= P/3*V*COSphi for example p=3000wat, Vph=220vac and
COSphi=0.9 so Iph= 3000/3*220*0.9= 5Amp now you shoose from
the manufacturers cataloque which circuit breakers is
nearest and suitable for your circuit for example 6Amps.
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / nitin kaushik
the rating of mcb is calculated by watts divided by
575...575 is the shortest calculation of root 3 cosQ.
| Is This Answer Correct ? | 3 Yes | 1 No |
Spacing of Transformers ratings are 10kva,15kva,25kva,63kva,110kva,150kva .........so on Q) Why transformer are not manufactured having ratings in between or other than these standard ratings ?
will a bulb glow connected to two phases of a delta connection?
Resistance of low voltage side of transformer compared to high voltage side is A less B equal C more D depens on design
what will be happen if we apply D.C supply to the transformer
TRAFO 1. WHY BREATHER IS USED. 2. WHY OIL GOES DOWN IN CONSERVATOR TANK. 3. WHY WE ARE TAKING OIL SAMPLE TAKING FROM BOTTOM OF TRANSFORMER. 4. HOW TO CHECK IR VALUE OF TRANSFORMER. 5. WHY OLTC HAVING BUCHHOLZ TRIP ONLY; WHY NO ALARM. 6. OFF LOAD TAP CHANGER OPERATION PROCEDURE. 7. TR. SHUTDOWN / ISOLATION PROCEDURE. 8. WHEN THREE TRS. IN PARALLEL, ONE TR. IS NOT SHARING THE LOAD – WHAT IS REASON AND WHAT YOU WILL DO. 9. WHY TR. HAS OLTC IN HV SIDE. 10. WHAT IS % IMPEDANCE. 11. WHY TR. RATING IN MVA. 12. WHAT IS VECTOR GROUP IN TR. 13. CONDITION FOR PARALLEL OPERATION OF TRS. 14. WHAT IS TERTIARY WINDING. WHERE IT WILL BE. 15. IF TR. TRIP ON BUCHHOLZ OR TAP CHANGER RELAY, WHAT YOU WILL DO. 16. DIFFERENCE BETWEEN OIL TEMP. AND WINDING TEMP. PROTECTION 17. HOW WINDING TEMP. IS MEASURED IN CAST RESIN TR. 18. DIFFERENT TYPES OF FAULTS IN TR. Trafo - Page-1 of 2 19. WHAT HAPPENS WHEN TR. CHARGED FROM LV. 20. WHAT WILL YOU DO IF MEGGER READING SHOWS ZERO BETWEEN LV WINDING AND EARTH. 21. CAN WE INTERCHANGE BUCHHOLZ RELAY OF MAIN TANK AND OLTC TANK. 22. IF THE LINE BETWEEN BREATHER AND CONSERVATOR TANK 23. LOCKED, WHAT WILL HAPPEN DURING LOAD CYCLE. 24. WHAT IS THE FUNCTION OF OIL SEAL IN BREATHER. 25. WHAT ARE LOCATIONS FOR BUCHHOLZ RELAY FIXED IN POWER TR. 26. WHAT ARE CHECKS IN POWER TR. DURING MAINTENANCE. 27. WHAT IS IMPORTANT WHEN WE CHECK OLTC OPERATION DURING MAINTENANCE. Trafo - Page 2 of 2
what is meant by GD2 ?
what happens in a genarator when rotor supplied with ac instead of dc
why star point of HT motor not earthed?
what is different between kvar & micro farad when its comes across the capacitor rating is it possible to convert kvar to mf or mf to kvar
When will you multiply and devide with derating factors to the actual value while sizing the cable?
how can i improve the power factor in domestic (230v)
What is the difference between automatic & semi-automatic star-delta starters?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)