Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

In a Circuit how the MCB and Fuse ratings are calculated.
And shall the fuse follws the MCB or it is otherwise?

Answer Posted / daher

the current rating of the fuse must be equal to the load
because the fuses melting point disconnect the circuit if
the current load becomes greater than the specific rating.
in high ruputer capacity fuse,the fuse able to carry1.2
over the rating.meaning 20% more.MCB rating calculation is
to know how mush the consuption load and according to that
cal.we decide the rate of MCB from the catalog rating of
CB, must be more than the load.DONT FORGET THE SHORT
CIRCUIT CALCULATION

Is This Answer Correct ?    35 Yes 13 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

at meter room 50 hrc switch installed,but there are not get earthing proper,so what happen?and 11kv transformer out put going in to hrc main 400a three nog each? so earthing is require for all switch? (some customer made earthing at there home.)

1962


what are the tests comes under the type test, what tests comes under routine tests.

1517


Role of active and reactive Power sharing in between two synchronized Generators, Droop Setting role ?

1811


briefly explain the main blocks found in a microprocessor based system

2247


What is meant by reactance voltage?

1195


what are factors comes under relay setting (distance relay 7sa52) under OPEN DELTA VTs connection??

2599


What is evaporator & condencer & compressor

2212


Application Comparison between 22KV (UE)and 33KV (E) system. Are we allowed to use 33KV (E) cable in lieu of 22KV (UE) cable. What are the technical disadvantages.

2410


How to calculate no of EARTH PIT? Describe the formula as per IS standard?

2242


how to calculate the earth mat design in 132 kv substation yard ????

6300


I need the recommended size for a 3 phase transformer at 13.8 KV Primary and connected loads of 3000 kVA at 4200 volts and 2375 kVA @ 480 volts AC.

2077


According to underground cables a) stress b/w sheath & conductor is high b) inrush of core & conductor

2023


When distance between two pulleys is not fixed, the tension of belt is adjusted by a) driver shaft b) driven shaft c) adjustment screw d) belt

3063


Explain the working of variable frequency transformer?

1212


Why we use duplex coil and hook switch in telephone system?

5090