Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


How we calculate airgap between phases & terminal box of
the transformer? any formulae.



How we calculate airgap between phases & terminal box of the transformer? any formulae...

Answer / dr rajan

There is no formula. It is always a thumb rule. The dielectric
break down of air is about 6kv/cm of gap. So depending on the
terminal voltage, use a rational distance keeping in mind the
connecting terminal dimensions of the cable. An average of 15
cm space between phases in 11Kv accepted as a practice.

Is This Answer Correct ?    2 Yes 1 No

Post New Answer

More Electrical Engineering Interview Questions

wath is this mining of dg

2 Answers   Nokia,


What is 11 N1 and 12 N2 in single phase Transformer ?

0 Answers  


Do you have any P.L.C in your organization?

12 Answers  


How the soft starter control the starting current in three phase squirrel cage AC Motor?

1 Answers  


how we calculate the motor rating of pump for water suction ?its any formula for that plz give thank u

3 Answers  


Can any body tell me about INNER SHUNT COMPOUND MOTOR diagram?

0 Answers  


I have a situation to design sub-Distribution board/Panel meant for feeding power sockets. In the incomer CAN i Take TP MCCB with Neutral Link and All the outgoing feeders with to sockets with TP MCCB and Neutral Link? P.S : My System is IT Earthing

0 Answers  


How does "OUT OF STEP" relay ,for Synchronous motor protection, work?

0 Answers  


In star and delta connected systems , for driving power and as well as light load which one you will preferred?

2 Answers   Aramco, IBM,


Why are use 22 kv 3ph supply ?

1 Answers   IOCL,


If I have a LT panel 3ph, 415V, 50Hz which demand load-600kw, how we can calculate its body earth strip size.

1 Answers  


WHAT IS THE FULL FORM OF ONAN ( TYPE OF COLLING IN TRANSFORMER)

7 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)