Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


If i want to build 230kv substation what are the equipments
to be installed?

Answers were Sorted based on User's Feedback



If i want to build 230kv substation what are the equipments to be installed?..

Answer / manoj k mishra

if you want to install 230kv substation you need to have
following equipments....
1.CTs
2.PTs
3.Lighting arresters
4.insulators
5.Transformer for stepping the volatage down
6.Circuit Breakers
7.contactors
8.BUS BARS

Is This Answer Correct ?    38 Yes 8 No

If i want to build 230kv substation what are the equipments to be installed?..

Answer / raju

First you need good consultent to design a 220kV Substation.

Is This Answer Correct ?    21 Yes 4 No

If i want to build 230kv substation what are the equipments to be installed?..

Answer / prodip das

Requirement
1.A suitable land
2.Suitable Environment
3.Proper Distance from City or population area
4.Easy communication
5.Efficient Technical manpower
6.X-former(Step down)
7.Busbar
8.Isolator
9.Circuit breaker
10.Lightining Arestor
11.CT & PT
12.Control Pannel
13.PLC(power line carrier)
14.Stone for proper capacitance

Is This Answer Correct ?    20 Yes 3 No

If i want to build 230kv substation what are the equipments to be installed?..

Answer / viswanathan karthikeyan

Basic Concept :
Incomer
Outgoings
Main Incomer -Cable or OHL LINE -PLEASE CONSIDER
STEPDOWN AUTO TRANSFORMER-220/132kV
NEXT AGAIN STEPDOEN TRANSFORMER-132/33Kv
stepdown Transformer-33/0.415kV

MAIN INCOMER NEED CIRCUIT BREAKER
220KV GIS
132KV GIS
33KV GIS

IF OHL LINE MEANS
gantry
WAVE TRAP
SURGE ARRESTER
COUPLING CAPACITOR
AAAC CONDUCTORS,TOWERS ETC(d0,d2,d6,d9,dt)

CABLE MEANS
220KV CABLE

CONTROL AND REALY PANELS
220,132,33 FOR RELAY AND PROTECTION PANEL

LV,HV,EHV CABLES
EARTHING MATERIALS
EARTHING AUXILLARY TRANSFORMER]
NEUTRAL EARTHING TRANSFORMER

TELECOMMUNICATION PANEL
SCS SYSTEM
BATTERY AND BATTERY CHARGES
EOT CRANE
PUMPROOM
LIGHTING AND LIGHTNING PROTECTION
EARTHING MATERIALS ETC

SO MANY ITEMS REQUIRED

I AM DOING THIS TYPE OF PROJECT
IF ANY DOUBT ,PLEASE SEND MAIL TO ME-vkn.1980@gmail.com

Is This Answer Correct ?    12 Yes 2 No

If i want to build 230kv substation what are the equipments to be installed?..

Answer / latha

To build a 230kv substation one needs
1.suitable land which is in industrial area
2.step down transformers with proper cooling systems
3.current transformers,potential transformers
4.current arresters
5.buses
6.transmission lines
7.circuit breakers
8.proper earthing facilities
9.skilled engineers,good maintanence faculty
10.control room which consists of relays circuit breakers
for protection scheme
11.air compressor unit
12.batteries and battery chargers
12.contactors
13.GOS

Is This Answer Correct ?    7 Yes 0 No

If i want to build 230kv substation what are the equipments to be installed?..

Answer / karthik.g

if you want to install 230kv substation you need to have
following equipments....
1.100MVA Transfomer
2.220 & 110 CB,CT,PT,Isolator,C&R Panels,LA,Insulator
3.PLCC equipments (if need)
4.110V & 50 V LT Switchgear
5.110V & 50V Battery & Charger
6.steel structure (for equipment erection)
7.120KN Disc Insulators (Normal)
8.Al.Bus Bar
9.Insulator hardware
10.Bolts & NUts
11.Conductor
12.earth wire
13.connectors
14.Marshaling Boxes & junction Boxes

Is This Answer Correct ?    6 Yes 0 No

If i want to build 230kv substation what are the equipments to be installed?..

Answer / loruenser

Mind quality connectors, as a very vital part!

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Electrical Engineering Interview Questions

thermal power station operation in general

11 Answers   AJ Square Inc, Jindal, NTPC,


A system absorbs 100 k J of heat and the increase in its internal energy is 100 kJ; the work done is

0 Answers   Caterpillar,


Re: What do you mean by Power factor of a generator? Power factor purely depends on the load (wether inductive, reactive or unity) then what does the Power factor mentioned on the generator nameplate means?

2 Answers  


How can a transformer test by megger?

1 Answers   Bosch,


What are the advantages of autotransformer?

0 Answers  


what is general test conduted by transformer

8 Answers   Wipro,


What is the source of dependent source ?

0 Answers  


If an electrical component has a positive temperature coefficient, how come such components have high power losses due to heat if current decreases when resistance increases? assuming power given by I^2*R whereby the Resistance is infinite.

0 Answers  


Is VVVFD reduced the starting current of an induction motor?

1 Answers  


what is ICU and ICS in breaker ratings

1 Answers   QAFCO,


Dear friends , I am going attend interview for WARTSILA INDIA LIMITED , power plant .Could any 1 pls send me few questions. the area i have to concentrate? please send it to mikalraj@gmail.com. pls help me out

1 Answers  


Why HT motor is connected in Star?

3 Answers   Equate,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)