What is the testing that a tester performs at the end of
unit testing?
Answers were Sorted based on User's Feedback
Answer / priyamagesh
after the unit testing is over and before we start with
integration testing we must perform thread testing.
| Is This Answer Correct ? | 1 Yes | 0 No |
What is mean by Test Plan? What details will be mention in it?
why do testing are divided into stages primarily becoz: 1)different stage has different purpose 2)Stages makes the testing simpler 3)Different test run in different environments 4)The no of stages the testing is easier Please do answer its urgent
What is Cycle Testing? Not Testing Life Cycle?
Difference between HTTP and HTTPS
why need testing ????
How do we review test specification document?
1. why do you go for test bed ?
What is the difference between sanity and smoke test? Please explain with an example.
What r the Macros?
What is Green Tesing, Red Tesing & Yellow Box Tesing?
What is defect WITHDRAW? When you do this?
3. In a system designed to work out the tax to be paid: An employee has £4000 of salary tax free. The next £1500 is taxed at 10%. The next £28000 after that is taxed at 22%. Any further amount is taxed at 40%. To the nearest whole pound, which of these groups of numbers fall into three DIFFERENT equivalence classes?