Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


what do you mean by 1 ton in AC`s

Answers were Sorted based on User's Feedback



what do you mean by 1 ton in AC`s..

Answer / rashmi ranjan

The cooling produced by melting of 1 ton of ice in a day is
taken as unit of refrigeration (in tons). Now unit of
refrigeration used in S.I. System is KW.
1 ton of refrigeration
= mass of ice x latent heat of ice / 24 hrs

= 900 kg x 335 KJ/Kg ( one short ton = 900 kgs )
------------------
24 x 3600 secs
= 3.4895 KJ/Sec
say 3.5 KJ / Sec = 3.5 KW

that is 1 ton of refrigeration = 3.5 KW

Is This Answer Correct ?    1 Yes 0 No

what do you mean by 1 ton in AC`s..

Answer / ravi shanker

the amount of refrigeration effect produced to melt 1000kg of ice in 24 hours.
1TR=1000*335kJ in 24hours (latent heat of ice=335kJ/kg)
= 1000*335/24*60
=232.6kJ/min

Is This Answer Correct ?    1 Yes 0 No

what do you mean by 1 ton in AC`s..

Answer / anand g

It means " removal of heat by a system required to melt 1 ton of ice in 24 hrs.......

Is This Answer Correct ?    1 Yes 0 No

what do you mean by 1 ton in AC`s..

Answer / amit sonmale

First Standard For 10*10Sq Ft Area
BTU=Wght(Kg)*Sp.Heat*Temp Diff.
=800Kg*1*15
=12000British Thermal Unit
1Tr =12000Btu

Is This Answer Correct ?    6 Yes 6 No

what do you mean by 1 ton in AC`s..

Answer / b.s.mallesh

12000 btu/hr,3.5 k.w

Is This Answer Correct ?    1 Yes 1 No

what do you mean by 1 ton in AC`s..

Answer / gopal manikpuri

1 ton AC means this AC can able to extract that amount of
heat/hr through which 1 ton water of zero degree, can be
convert to ice of zero degree.

Is This Answer Correct ?    1 Yes 1 No

what do you mean by 1 ton in AC`s..

Answer / nawaz

It means that in a closed room(at room temperature)the
cooling effect realized when u melt 1000kg of ice for 1 day.

1 ton = 12,000 BTU {Heat Removal/hour}
BTU system is followed in USA,UK & India

Is This Answer Correct ?    3 Yes 4 No

what do you mean by 1 ton in AC`s..

Answer / pramod

it means capacity to cool one ton of air in 24hrs.

Is This Answer Correct ?    5 Yes 6 No

what do you mean by 1 ton in AC`s..

Answer / ar.dinesh

The amount of the heat required to convert 1 ton
of ice in to water within 1hours. The initial
temperature of water is 0 deg C.

Is This Answer Correct ?    1 Yes 2 No

what do you mean by 1 ton in AC`s..

Answer / om

1 Ton = 3000 Callori/Hour

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Electrical Engineering Interview Questions

Which element has power dissipated in it when the source is removed ?

2 Answers   SSC,


HOW VFD USED IN ENERGY SAVING

8 Answers   ITC Infotech,


at work we have a 3 phase motor but on testing one phase isnt getting a reading. it runs 24 hours a day all week. stops and starts well no noise or heating. the phase isnt down to earth.is it just a bad meter reading or not? phases one and three came up with a resistance reading of 0.4 but phase 2 couldnt get anything shows up as open circuit.

0 Answers   iGas,


How to increase the specific gravity of DG batteries?

3 Answers   SCS,


Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.

0 Answers   HAL,


can any one explain me the where is the use of plc and scada

4 Answers  


What is the Resposiblity of Electrical Utility Engineer

0 Answers  


What are the disadvantages of hydropower?

0 Answers  


how much LT load can bear by the 100 KW HT connection.

0 Answers  


it is difficult to interrupt a capacitive current because (a)it has a leading power factor (b)current magnitude is very small (c)the restriking voltage can be high (d)stored energy in the capacitor is high

2 Answers   DGVCL Dakshin Gujarat Vij Company, MGVCL, UGVCL Uttar Gujarat Vij Company Ltd,


how much up to LT Voltage range?

4 Answers  


what is the difference in using the 125% and the 250% factor of safety in calculating circuit breakers capacity for motors,which is more reliable to use the 125% or 250%??

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)