why +1 to be followed for calculating the no of bars in BBS. Please explain
No Answer is Posted For this Question
Be the First to Post Answer
WAS PUMP MODEL WXB DESIGNEDIN ACCORDING API 610 STANDARD?
Will water damage concrete?
how to calculate steel columns beams and slab please give me brief calculation
14 Answers Focus, Haven Foundation, Indian Railways, Surya Builders, VICC,
what energized you to complete your course?
Meaning of civil engg. in hindi
4 Answers NC Infracon, Reliance,
Can anyone give me the thumb rule for calculating the time required for construction based on quantity of concrete, Reinforcement, shuttering, etc
what is quick sand
How to calculate measurement box size for M25 grade cement?
3 Answers Perunding Omega PMC,
What is type failure of road surface? how to repair the failure of road surface?
How to do BBS for Chair Rod?
Deshuttering time for slab 6.15 meter
calculation of cement bags in 1:2:4 concrete mix
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)