Tell me about the subcontracting cycle.
Answers were Sorted based on User's Feedback
Answer / gunda_vk
The Po is created with item category L,
the goods is transferred to subcontractor by 541 movement.
for this movement note no accounting docs take place.
When GR is done automatically, 543 movement takes place
which take care of the consumption of components from
stock.
Is This Answer Correct ? | 11 Yes | 0 No |
Answer / desikan
Sub-contract activity starts with creation of component
level BOM. Need to identify what is the finished material
for which the component(s) are assigned. While creation of
PO with item category "L" for the finished material, system
picks the components. Goods can be transferred thro' MB1B
transaction with 541 movement to sub-contractor. System
proposes all the components & the corresponding qty while
transferring. After the posting, the stock will be shown
under vendor. While creation of GR for the finished
component (i.e. 101 movement), system also creates movement
543 for the components available with sub-contractor and
consumes the vendor stock.
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / rajesh
the first person reply is corrct andfor posting the
material to sub-contractor we must maintain minimum stock
without stock we cant send the material to the sub-
contractor
Is This Answer Correct ? | 1 Yes | 1 No |
Explain why we use document types in sap?
What is *make to order?
How to find the status of IDHOC in SAP MM?
Tell me about the various movement types and usage.
i am doing sap mm,i have a question, do consultants copy n save from sap std.1000 in real time too
How to create movement type?
HOW TO CHANGE CONVERSION FACTOR AFTER MADE GRN.
What is purpose of gr based invoice verification in business? What is the business benefit of this check box?
Explain release strategy
What are the steps involved in creating a pricing procedure?
How is an item with serial no. managed?
If you want to make item ok check boix as default then what will you do?