what is QA/QC LIFE CYCLE?
Answers were Sorted based on User's Feedback
Answer / karuna
qa/qc life cycle is nothing but v-model.
qa- means related to verification
qc- means related to validation.
in v model,verification will be going on in one phase
& validation will be going on in the other phase.
so we call it as qa/qc life cycle.
plz,if i am wrong,respond to this question
karunakar
Is This Answer Correct ? | 7 Yes | 0 No |
Answer / rodrigo carvalho
Not precisely, QA is not validation. Quality Control
(testing) is a part of QA (which devided into constructive
& analytic). In the V methodology model, verification is
checking agains last stage.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / poonam gulati
just a correction....
QA means Validation
QC means verification
Is This Answer Correct ? | 0 Yes | 14 No |
How to start testing after project kick off ???
Enlist some automation testing tools.
Negative testcases for salary application..
I. A code inspection is held for new code. II. A code inspection is held for reused code. III. A code inspection is held after the first compilation. IV. A code inspection is held after the first error-free compilation. Which of the statements above are true of code inspections? 1. I and IV 2. I, II, and IV 3. I, II, and III 4. II and IV 5. II and III
can 100% quality be achieved?
what is meant by negative testing..give me one example?
17 Answers MBT, TCS,
What do you like most about Quality Assurance/Testing?
Due to shutdown failure, one application is not running then what type of testing do u perform? Load testing or stress testing or recovery testing ?
what kind of issues do u think a QA team might face if sw is built incorrectly?
Anything you know about host file
What does the test strategy include?
What is exploratory testing and specification-driven testing?