PET model architecture..?
Answers were Sorted based on User's Feedback
Answer / rajendra prasad reddy penumall
PET- Process Involves Experts,Tool and Techniques.
It is a refinement form of V-model.It defines mapping
between development and testing process.
This model is developed by HCL and recognised By QA forum
Of India
| Is This Answer Correct ? | 4 Yes | 1 No |
Every one know that PET is a refinement form of V-model.
PET means,
"PROCESS INVOLVES EXPERTS TOOLS AND TECHNIQUES".
The V-model is a software development model which can be presumed to be the extension of the waterfall model. Instead of moving down in a linear way, the process steps are bent upwards after the coding phase, to form the typical V shape. The V-Model demonstrates the relationships between each phase of the development life cycle and its associated phase of testing.
PET model architecture plays an important role in SORTWARE TESTING..
| Is This Answer Correct ? | 1 Yes | 0 No |
What are two of your strengths that you will bring to our QA/testing team?
what is use of application server-web logic
What are the challenges faced with the 1+ years experience team.
What is CMM and CMMI? What is the difference?
What is the difference between system integration testing and end-to-end testing? With examples pls
what is CAPA?when is root cause analysis done?
1 Answers Ariel, Knorr-Bremse, NIIT,
What are attributes and skills of LEAD AUDITORS?
hi , This is krish from chennai . i like to do istqb certification for foundation level . if any one have material for that kidely help me. just send me the material to krishmca29@rediffmail.com. thanks is advance for sending .
what is meant by negative testing..give me one example?
17 Answers MBT, TCS,
What are the tables in testplans
Need urgent answers for the interview questions? Interviewer asked 1) when you don't have enough requirements spec how did you perform testing? 2) once the project went live if you come to know that there is a bigger defect(bug) what will you do? 3) when there is a bug in the code but not mentioned in the requirement spec( while testing for some other if you come to know this bug) what will you do? I answered these questions but interviewer was not satisfied can any one please tell me the best answers for these kind of situations. I have other interview next week so please provide me the answers or can email me the answers my I'd is tester582@gmail.com. Thanks in advance
How Many CMM levels are there?? What are the main differences between each level?