How would you attach a drawing to the equipment master data?
No Answer is Posted For this Question
Be the First to Post Answer
Suppose there is a difference between the planned and actual hours of internal manpower where will you document the reason/ cause of this variance. Is there any standard sap facility available to address such situation.
Why do you need an equipment and functional location both?
How does actual cost of maintenance come on maintenance order?
what is the use of item number in maintenance order ?
What is structure indicator?
What do the cs03 tcodes in sap- pm mean?
What is maintenance planning? What are different types of maintenance planning?
How to configure the integration of pp and pm, where it is being done in spro, what are the pre-requisite and what are the steps?
In which business process you can use serial numbers?
Is it possible to change the equipment category once created?
What if maintenance failed refurbish a material, how will you handle such situation in sap?
Is it possible to determine header tasks automatically at save without selecting the save + determine tasks button?