In case of a beam ,main steel is provided along the longer
span because, bending moment is directly proportional to
length but why in case of one way slab main steel is
provided along shorter span while as bending takes place
along longer span?comment
Answers were Sorted based on User's Feedback
Answer / ramiz,guwahati
BECAUSE IN CASE OF ONE WAY SLAB THE LOAD IS TRANSFERED
THROUGH THE SHORTER SPAN ONLY.
| Is This Answer Correct ? | 8 Yes | 1 No |
Answer / aman kumar gupta
beam is design considering 1m widh .in case of one way slab ,due to the compression in concrete above the neutral axis it expand and contract tension zone below axis.so the shape of the slab do not remaining rectangular but becomes trapezoidal.so in order keep it remain rectangular the remaining concrete develop stress in opposite direction due to which a secondary moment is induced in the slab(negative moment)so the reinforcement is done along shorter span.
| Is This Answer Correct ? | 6 Yes | 1 No |
Answer / kannan
This is because the deflection of the oneway slab is more
on shorter side. Example if you take 30cm plastic / steel
scale, apply the load longitudanoly, immidiately deflecton
takes place over the particle. Hence to avoid the
deflection of slab, main reinforcements are provided in
shorter span.
| Is This Answer Correct ? | 6 Yes | 4 No |
Answer / narendra
BECAUSE IN CASE OF ONE WAY SLAB THE LOAD IS TRANSFERED
THROUGH THE SHORTER SPAN ONLY.
AND
IT IS POSSIBLE TO DESIGN IT (MAI STEEL) ALONG LONGER SPANS
TOO BUT THE STEEL REQUIREMENT WILL BE MORE AND HENCE IT
WILL NOT BE VIABLE SOLUTION.9THIS IS THE MAIN REASON.
| Is This Answer Correct ? | 3 Yes | 1 No |
how to the steel dia without using d2/162
what is conrete grade ,how are depent on concrete grad and size of concrete?
How do you calculate qty for form work like props shuttering sheet and acro span for residential block ? for Example: 10 sq mt what is the material and qty require to do form work.
In which code the the maximum height of concrete casting has been explained
how do you measure the 1:2:4 and 1:1:2 proportion rcc concrete for one cubic metre? what is the cement qty. sand qty. jelly qty.
Steel requirement in kg of 6" thk slab Total qty 32.64 m3 Beam / column qty 35.39 m3
what is the amount of absorption of slurry in shuttering ply board. what is the amount of slurry leakage allowed for 1 m3 of concrete.
What is the density of steel? what is the IS code for steel structures? 1t/m2 = ?KN/m2 ??
If 600mm*200mm*150** size bricks comes 55 piece in one cubic meter then how many 230mm*115mm*75 bricks in one cubic meter
How much overlapping required for welding the reinforcement bars in Columns & beams
what is cbr valuve
How much Bentonite is required per Cubicmeter of pile for a cast insitu pile?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)