In case of a beam ,main steel is provided along the longer
span because, bending moment is directly proportional to
length but why in case of one way slab main steel is
provided along shorter span while as bending takes place
along longer span?comment
Answers were Sorted based on User's Feedback
Answer / ramiz,guwahati
BECAUSE IN CASE OF ONE WAY SLAB THE LOAD IS TRANSFERED
THROUGH THE SHORTER SPAN ONLY.
| Is This Answer Correct ? | 8 Yes | 1 No |
Answer / aman kumar gupta
beam is design considering 1m widh .in case of one way slab ,due to the compression in concrete above the neutral axis it expand and contract tension zone below axis.so the shape of the slab do not remaining rectangular but becomes trapezoidal.so in order keep it remain rectangular the remaining concrete develop stress in opposite direction due to which a secondary moment is induced in the slab(negative moment)so the reinforcement is done along shorter span.
| Is This Answer Correct ? | 6 Yes | 1 No |
Answer / kannan
This is because the deflection of the oneway slab is more
on shorter side. Example if you take 30cm plastic / steel
scale, apply the load longitudanoly, immidiately deflecton
takes place over the particle. Hence to avoid the
deflection of slab, main reinforcements are provided in
shorter span.
| Is This Answer Correct ? | 6 Yes | 4 No |
Answer / narendra
BECAUSE IN CASE OF ONE WAY SLAB THE LOAD IS TRANSFERED
THROUGH THE SHORTER SPAN ONLY.
AND
IT IS POSSIBLE TO DESIGN IT (MAI STEEL) ALONG LONGER SPANS
TOO BUT THE STEEL REQUIREMENT WILL BE MORE AND HENCE IT
WILL NOT BE VIABLE SOLUTION.9THIS IS THE MAIN REASON.
| Is This Answer Correct ? | 3 Yes | 1 No |
Which stone is best for wall construction Laterite Stone or Cement Blocks
what is the curing time for plastring (all)?
what is the best method for analysing frames of multistoreyed structures
In an aggregate blending plant, water is sprayed before blending is performed. If the fine content in aggregate is as high as 25 %, will not the fines form into lumps / balls and distribution will not be uniform ? Further, the fines will stick onto the interior of pug mill and its content will be low. The mixed material is stockpiled for weeks / months before use. Will it not be better that blending is done in dry condition, and water will be added only during compaction at site. Please forward your comments and suggestions.
Why was the empire state building made of steel?
how to calculate Tile skirting
What is the use of mirror command?
What is the finess modulus of sand?
Can anyone tell me the sequence of the activities in a drawing room, kitchen & Toilet including civil work, finishing, electrical & plumbing fittings
In site how we can identify one way slab and two way slab?
11 Answers Parth Constructions,
what do u mean by elongation & flakiness of aggregate?
limit value of bulking of sand
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)