What is the difference between built area and super built up area?
No Answer is Posted For this Question
Be the First to Post Answer
1)What is Suggested type of cement for concreting at water, for mass concreting and where the chaces of gettin attucked by salt? 2)How many types of camber? 3)why we always preffer short column in case of residential building? 4) Is there any advantages between the use of One way slab & two way slab? 5)What shoul be the % of steel for R. C. C. perpose based on volume & area ?
WHAT R THE GENERAL TECH QUESTIONS ASKED FOR THE INTERVIEW FOR AN AUTOMOBILE INDUSTRY,SPECIALLY DESIGN DEPT
mix proportion of M20 AND what are different grades below it
6 Answers B L Kashyap, L&T, Panchshil Infrastructure,
what is civil all interview questions
What expenses counted in contingencies and how much it is in related to built-up area of the building.
percentage of steel in one cubic meter of concrete
What are the disadvantages while using stone dust as filler in pavements?
What is the density of 1:1.5 (Cement:sand) ratio in plaster? And Conversion in 12.5 mm thickness per square meter? Howmany Kg of Cement square meter in ratio of 1:1.5?
how to calculate the quantity of material in 1 cubic meter Concrete?
10 sqr in room reinforce concret so athu evvalavu wait thankum , atha eppati calculate panrathu
how do you intend to overcome such challenges?
Which Cement is good for concrete, Is that grade 33, 43 or 53?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)