How much cement and water required for cement selery????
No Answer is Posted For this Question
Be the First to Post Answer
Please Clear My doubt . We Can Design the size of the beam by manually by the Length of the beam...What is the technique adopted
For G+4 storied building having 76000 sft per each floor, can you prepare schedule in such a way that structure should be completed with in 41/2 months and finishing be completed with in 51/2 months?
what is the load bearing capacity of the scafolding pipe (50mm) and other.
how do we calculate quantity of cement , sand and aggregates in 1 m3 of M30 grade concrete ?
31 Answers ABES Engineering College, Gammon, Jalanidhi, NCC,
What is the difference between load bearing and non load bearing walls? How to distinguish both?
What is grouting? Why it is done?
What is chemical composion test
Which foundation is stronger, Pile or Standard?
what is the criteria for placing reinforcement in footing and slabs e.g which span have to place first.
4 Answers Al Futtaim Carillion, NTPC,
what is development length,where it is used and why it is used?
how much volume is one bag cement of 50kg
15 Answers Portland, RJB, UltraTech,
define the strength
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)