Define What is aggregate?
No Answer is Posted For this Question
Be the First to Post Answer
you are planning to paint a newly fabricated workshop building made of structural steel of 10 tons total mass.you are require to paint 1 cot of primer and 2 coats of top coat.How many liters of primer and top coat you will request
21. Are you able to work under pressure?
what is the initial setting time & maximum duration concrete get hardening for ordinary portland cement?
Why we are using coarse sand for brick work and is there any technical problem if, we use fine sand instead of coarse sand.
CROSS SLOPE OF Macadam Construction
What is meant by Anchorage length? Development Length?
calculate qty of sand in 15 mm plaster for 100 sqm.
What is creep ,deflection and shrinkage in concrete
What is the best mixture ratio in building a power plant? what is the weight of a 1 sack cement? what is the density of a cement?
What are the reasons for geotechnical site investigations in uganda?
what is escalation?how it is done?
how to calculate bearing capacity of soil
6 Answers L&T, Reliance, Sujala Infrastructure, TATA,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)