What is alternate bid?
No Answer is Posted For this Question
Be the First to Post Answer
how to find the carpenter work per day? how many cubic feet they should be work per day?
How much steel required for only ground floor of 1600 Sq foot.Having general structure ?
How Much span required for 1 sqm of shuttering(Beam & Slab)
what is the weight of concrete cube of 1ft*1ft*1ft? tell me weight in pound & in KG
How many steel is require in one cubic meter area?
How do you calculate the power of centrifugal pump?
what is the definition of stress& strain.
what is the quantity of cement,sand and aggregate in 600*600*1600 mm in 1:4:8
Ihave 230mm *115mm * 75mm brick calculation in cft and 115mm brick calculation in sft
How will we calculate the number of cement bags in 6 foot by 6 foot footing?
15mm thick plastering 1:4 what is the cement consumption per sqm
sir how can we find the cement and sand required for making 4" drop