how to calclate the SHUTTERING TAKEN CONCRETE LOAD?
WHAT IS THE LOAD BEARING CAPACITY IN STEEL SHUTTERING PLATE?
WHAT IS THE CONCRETE LOAD IN (MASS) IN THE SHUTTERING PLATE.
PLATE SIZE IS 120CM* 90CM
CONCRETE WALL LENGTH IS 10M ,WIDE IS 60CM, HEIGHT IS 1.2M
PLS TO SENT THE CALCULATION.
No Answer is Posted For this Question
Be the First to Post Answer
I am called for interview from north east power plant .so, I need some interview question which may help me.
For plain cement concrete we want use 20mm aggregate are 40mm mm aggregate
What is difference between ceramic and vitrified tile
state the difference between direct and indirect cold water supply scheme
what"s the difference between fe 415 grade steel and fe 500 grade steel? and which one is mostly used for residential and apartment constructions?
Suppose a new brick wall is being constructed,and the courses and not aligned horizontally,what negetives can it cause?
what is the water cement ratio? how to calculate it? list the wt. of constructions materials including concrete both ordinary and light wt. concrete
what is RFI.How to prepare for slabs and beams connecting works to be executed.give order of work to be done.
which is code used for ppc cement
How we decide the the load combinations for design of RCC structures?
How do i calculate material requirements for various concrete ratios, brick masonry for 1 cum?
how much is the maximum compressive strength of soil cement and soil-cement-microsilica .
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)